大神宮下駅
Daijingūshita Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
4 Events
1921
7月17日
The station opened, with a structure consisting of two side platforms serving two tracks.
Machine translation — show Japanese original
開業。構造は相対式ホーム2面2線。
1981
An overpass was newly established and the in-yard crossing was abolished.
Machine translation — show Japanese original
跨線橋を新設、構内踏切を廃止。
2004
11月27日
The up platform was elevated.
Machine translation — show Japanese original
上りホームを高架化。
2006
11月25日
The down platform was elevated.
Machine translation — show Japanese original
下りホームを高架化。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Daijingūshita Station FAQ
What train lines connect at Daijingūshita Station?
Daijingūshita Station is served by .