Higashi-Kanagawa Station
Higashi Kanagawa is a railway station in Tokyo.
Riding today
Live departures from this stationAbout this station
History, melodies, surroundingsAt the time, Japanese National Railways had a Kannawa Station, so "East" was added to the front.
Machine translation — show Japanese original
当時、国鉄に神奈川駅(後に廃止)が存在したため、頭に「東」を冠した。
The Yokohama Railway Line, later known as the Yokohama Line, opened to Hachiōji Station and the station opened as a transfer point between the Japanese National Railways Tōkaidō Main Line and the Yokohama Railway Line.
Machine translation — show Japanese original
横浜鉄道線(後の横浜線)が八王子駅まで開通し、国鉄東海道本線と横浜鉄道線の接続駅として開業。
The freight branch line of Yokohama Railway was extended to Kaigannarawa Station.
Machine translation — show Japanese original
横浜鉄道の貨物支線が海神奈川駅まで開通。
The Keihin Electric Railway, the predecessor to the Keihin Tohoku Line, began operating.
Machine translation — show Japanese original
京浜電車(京浜東北線の前身)運行開始。
The Keihin Electric Railway was suspended from operation due to frequent breakdowns.
Machine translation — show Japanese original
京浜電車の故障頻発により運転中止。
Keihin Electric Railway operations resumed.
Machine translation — show Japanese original
京浜電車運転再開。
Steam locomotive train service was discontinued.
Machine translation — show Japanese original
蒸気機関車列車の停車廃止。
The freight branch line to Takashima Station was opened.
Machine translation — show Japanese original
高島駅までの貨物支線開通。
The Yokohama Railway was nationalized.
Machine translation — show Japanese original
横浜鉄道が国有化。
The electrification of the Yokohama Line between Higashi-Kanagawa and Haru-Machida (now Machida) was completed.
Machine translation — show Japanese original
横浜線東神奈川 - 原町田(現町田)間電化完成。
The freight branch line to Higashi-Kanagawa was transferred from the Yokohama Line to the Tokaido Main Line.
Machine translation — show Japanese original
東神奈川までの貨物支線が、横浜線から東海道本線に所属変更。
Electrified train operation began on the Yokohama Line to Hara-Machida and through service to Sakuragicho started.
Machine translation — show Japanese original
横浜線原町田までの電車運転開始、桜木町までの乗り入れ開始。
The station building was completely destroyed in the Great Yokohama Air Raid.
Machine translation — show Japanese original
横浜大空襲で駅舎が全壊する。
The business scope was revised from "general transportation business" to "passengers, luggage and small packages, but delivery is not made", and cargo handling was abolished, while the freight branch lines to Kōtōjima Station and Kaigannarawa Station were also abolished.
Machine translation — show Japanese original
営業範囲を「一般運輸営業」から「旅客、手荷物及び小荷物。ただし、配達はしない。」へ改正し、貨物取り扱いを廃止。同時に東高島駅および海神奈川駅までの貨物支線が廃止。
The Yokohama Line resumed operations into Sakuragicho.
Machine translation — show Japanese original
横浜線の桜木町乗り入れ再開。
The station was elevated and a free passage was opened.
Machine translation — show Japanese original
橋上駅舎化および自由通路開設。
The Higashi-Kanagawa Station-mae electric stop (East Exit) on the Yokohama City Electric Railway was abolished.
Machine translation — show Japanese original
横浜市電の東神奈川駅前電停(東口)が廃止になる。
The double-tracking of the Yokohama Line between Higashi-Kanagawa and Ōkawa was completed, and the track layout within Higashi-Kanagawa was revised accordingly.
Machine translation — show Japanese original
横浜線東神奈川 - 大口間複線化完成、これに合わせて東神奈川構内の配線変更。
The West Exit stop at Tsurumi Station of Yokohama City Electric Railway was abolished.
Machine translation — show Japanese original
横浜市電の東神奈川駅西口電停が廃止になる。
The business scope was revised to "passengers and freight".
Machine translation — show Japanese original
営業範囲を「旅客、荷物」へ改正する。
Freight handling was abolished.
Machine translation — show Japanese original
荷物の取り扱いを廃止。
The expansion to 2 island platforms with 4 tracks was completed with the installation of the first electronic interlocking system on Japanese National Railways, which began operational use, manufactured by Dōtō Signal.
Machine translation — show Japanese original
1番線を増設して2面4線化工事完成、国鉄最初の電子連動装置の実運用を開始(大同信号製)。
The handling of luggage, limited to newspapers, was resumed.
Machine translation — show Japanese original
荷物(新聞紙に限る)の取り扱いを再開。
With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).
Machine translation — show Japanese original
国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。
Automatic ticket gates were installed and put into use.
Machine translation — show Japanese original
自動改札機を設置し、使用を開始する。
Departure melodies were introduced.
Machine translation — show Japanese original
発車メロディを導入。
The IC card "Suica" becomes available for use.
Machine translation — show Japanese original
ICカード「Suica」の利用が可能となる。
The operation of indicator-equipped lighting began.
Machine translation — show Japanese original
インジケーター付き照明の運用開始。
The use of platform doors began on platforms 1 and 4 for the Keihin-Tohoku Line.
Machine translation — show Japanese original
1・4番線(京浜東北線)ホームでホームドアの使用を開始。
The use of platform screen doors with a slitted frame began on platform 2 for the Keihin-Tohoku Line and Yokohama Line.
Machine translation — show Japanese original
2番線(京浜東北線・横浜線)ホームでスリットフレームホームドアの使用を開始。
The use of platform screen doors with a slitted frame began on platform 3 for the Yokohama Line.
Machine translation — show Japanese original
3番線(横浜線)ホームでスリットフレームホームドアの使用を開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Getting around
Platforms, transfers and navigationCommunity Photos
Photos shared by riders. Been to this station? Add yours.
Higashi-Kanagawa Station FAQ
What train lines connect at Higashi-Kanagawa Station?
Higashi-Kanagawa Station is served by Keihin–Tōhoku Line, Yokohama Line.