東北沢
Higashi-Kitazawa Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
13 Events
1927
4月1日
The station opened and began handling passengers and freight.
Machine translation — show Japanese original
開設。旅客・貨物取扱開始。
1966
Freight handling was abolished.
Machine translation — show Japanese original
貨物取扱廃止。
1978
3月31日
The section between Yoyogi-Uehara Station and the current station was quadrupled.
Machine translation — show Japanese original
代々木上原駅 - 当駅間複々線化。
2004
9月
Work began on the undergrounding and quadruple-tracking project.
Machine translation — show Japanese original
地下化・複々線化工事着手。
2005
10月1日
Tracks 2 and 3 (the express lines) were closed due to underground construction and quadruple-tracking work.
Machine translation — show Japanese original
地下化・複々線化工事のため、2・3番線(急行線)使用停止。
2006
11月25日
The provisional bridge-style station building began to be used, and at the same time, the up line was switched to the provisional platform.
Machine translation — show Japanese original
仮設橋上駅舎使用開始。同時に上り線が仮設ホームへ切替。
2009
4月25日
The down line was switched to a temporary platform.
Machine translation — show Japanese original
下り線が仮設ホームへ切替。
2013
3月23日
The section between this station and Setagaya-Daita Station was undergrounded, and temporary underground platforms began to be used at the same time.
Machine translation — show Japanese original
当駅 - 世田谷代田駅間地下化。同時に仮設地下ホーム使用開始。
2014
1月
Station numbering was introduced and began to be used.
Machine translation — show Japanese original
駅ナンバリングが導入され、使用を開始。
2015
5月16日
The above-ground station building began operation.
Machine translation — show Japanese original
地上駅舎使用開始。
2016
11月26日
The above-ground station building was completed.
Machine translation — show Japanese original
地上駅舎完成。
2018
3月3日
The quadrupling of the line was completed, and express line and local line operations using the newly established home platforms began.
Machine translation — show Japanese original
複々線化完成。急行線(通過線)と緩行線本設ホーム運用開始。
2018
3月17日
With the timetable revision accompanying quadrupling, through trains on the Tokyo Metro Chiyoda Line began stopping.
Machine translation — show Japanese original
複々線化に伴うダイヤ改正に伴い、東京メトロ千代田線直通列車停車開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Higashi-Kitazawa Station FAQ
What train lines connect at Higashi-Kitazawa Station?
Higashi-Kitazawa Station is served by Odakyu Odawara Line (OH).