南町田グランベリーパーク
Minami-machida Grandberry Park Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
16 Events
1976
10月15日
It opened as Minamimachida Station.
Machine translation — show Japanese original
南町田駅(みなみまちだえき)として開業。
2000
4月
It became the first railway station in Machida City to have an elevator installed inside the ticket gates.
Machine translation — show Japanese original
町田市内の鉄道駅としては初めて、駅改札内にエレベーターを新設。
2000
5月
It installed a solar power generation system with a built-in method as part of the platform roof for the first time in a Japanese railway company.
Machine translation — show Japanese original
日本の鉄道会社で初めてホーム上屋の一部に組み込む方式の太陽光発電システムを設置。
2000
7月15日
On August 20, it became a temporary stop for express trains during the excursion season only.
Machine translation — show Japanese original
8月20日:行楽期に限り急行の臨時停車駅となる。
2001
8月1日
A new north entrance was established.
Machine translation — show Japanese original
北口新設。
2006
3月18日
Limited express trains began stopping on weekends only.
Machine translation — show Japanese original
急行が土休日に限り停車開始。
2014
6月21日
Semi-express services started.
Machine translation — show Japanese original
準急停車開始。
2017
2月13日
The Granberry Mall entrance was renamed the Front entrance due to the closure of Granberry Mall.
Machine translation — show Japanese original
グランベリーモール閉館に伴い、グランベリーモール口を正面口に改称。
2017
4月1日
Bus entry into the north exit station square began.
Machine translation — show Japanese original
北口駅前広場へバス乗入開始。
2017
12月9日
The location of the main ticket gate was changed due to station improvement work.
Machine translation — show Japanese original
駅改良工事に伴い、正面改札口の位置を変更。
2019
Reiwa 1
Machine translation — show Japanese original
(令和元年)
2019
6月9日
With station improvement work, the front gate and north gate ticket gates were closed, and a new central gate was established, with partial use of the new station building beginning.
Machine translation — show Japanese original
駅改良工事に伴い、正面改札と北口改札口を閉鎖、新たに中央改札新設。新駅舎の一部を使用開始。
2019
9月8日
Platform screen doors began operating.
Machine translation — show Japanese original
可動式ホームドア使用開始。
2019
10月1日
The station was renamed Minamimachida Granberry Park Station and became a stop for rapid services on weekdays.
Machine translation — show Japanese original
南町田グランベリーパーク駅へ改称。平日ダイヤの急行停車駅となる。
2019
11月6日
The ticket gates and waiting room of Granberry Park began to be used and the south exit was renamed Granberry Park exit.
Machine translation — show Japanese original
グランベリーパーク改札と待合室使用開始。南口をグランベリーパーク口へ改称。
2019
11月13日
New departure melodies were introduced to coincide with the opening of Minamimachida Grandberry Park Town.
Machine translation — show Japanese original
南町田グランベリーパークまちびらきに合わせ、新たな発車メロディ使用開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (DT TOKYU DEN-EN-TOSHI LINE)
1
Down
中央林間
2
Up
渋谷 · 押上〈スカイツリー前〉 · 春日部
↕ Platforms 1, 2 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Minami-machida Grandberry Park Station FAQ
What train lines connect at Minami-machida Grandberry Park Station?
Minami-machida Grandberry Park Station is served by DT Tokyu Den-en-toshi Line.