南多摩
Minami-Tama Station
Live Network Status Active
Minami Tama is a railway station in Tokyo.
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
17 Events
1927
The Ōmaru stop was located approximately 300 m closer to Kawasaki Station from the current Minamitama Station.
Machine translation — show Japanese original
この大丸停留場は現在の南多摩駅からおよそ300 m川崎駅寄りの位置にあった。
1927
11月11日
The Nambu Railway opened from Nagatsu Station, with Ōmaru Stop as its terminus.
Machine translation — show Japanese original
南武鉄道が登戸駅から開業、終着駅として大丸停留場(おおまるていりゅうじょう)が開業。
1928
12月11日
The line was extended to Yashiki-bunki Station, now known as Bamba Station.
Machine translation — show Japanese original
屋敷分駅(現在の分倍河原駅)まで延伸。
1931
The stop was renamed Tama-Seiseki-guchi Stop.
Machine translation — show Japanese original
多摩聖蹟口停留場(たませいせきぐちていりゅうじょう)へ改称。
1934
10月21日
Minamitamagawa Station (freight) was opened.
Machine translation — show Japanese original
(貨)南多摩川駅が開設。
1939
9月14日
Minamitamagawa Station merged with Tamatoseki-guchi Stop and relocated to its current location, and was renamed Minamitama Station.
Machine translation — show Japanese original
南多摩川駅が多摩聖蹟口停留場を併合して現在地に移転、南多摩駅に改称。
1944
4月1日
With the nationalization of Nambu Railway, it became a station on the Ministry of Railways Nambu Line.
Machine translation — show Japanese original
南武鉄道の国有化に伴い、運輸通信省南武線の駅となる。
1956
12月1日
Freight handling was abolished.
Machine translation — show Japanese original
貨物取扱廃止。
1987
4月1日
With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).
Machine translation — show Japanese original
国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。
1993
10月14日
Automatic ticket gates were installed and began operation.
Machine translation — show Japanese original
自動改札機設置、供用開始。
2001
11月18日
The IC card "Suica" becomes available for use.
Machine translation — show Japanese original
ICカード「Suica」の利用が可能となる。
2009
5月31日
The Midori no Madoguchi service ended operations.
Machine translation — show Japanese original
みどりの窓口の営業を終了。
2011
12月24日
The down line was switched to the elevated line.
Machine translation — show Japanese original
下り線を高架線に切替。
2013
12月23日
The up line was switched to the elevated line.
Machine translation — show Japanese original
上り線を高架線に切替。
2014
4月1日
The north entrance was opened.
Machine translation — show Japanese original
北口を開設。
2015
3月14日
The station becomes a rapid service bypass stop with the start of rapid service operations on the entire Nanbu Line.
Machine translation — show Japanese original
南武線全区間での快速運転開始に伴い、快速通過駅となる。
2024
3月6日
The use of Smart Home Door was started.
Machine translation — show Japanese original
スマートホームドアの使用を開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (NAMBU LINE)
1
Down
府中本町 · 立川
2
Up
登戸 · 武蔵小杉 · 川崎
↕ Platforms 1, 2 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Minami-Tama Station FAQ
What train lines connect at Minami-Tama Station?
Minami-Tama Station is served by Nambu Line.