武蔵小山

Musashi-koyama Station

Live Network Status Active

Musashi koyama is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
12 Events
1923 3月11日

It opened as Oyama Station with an island platform with one face and two lines, and a freight platform was installed.

Machine translation — show Japanese original

小山駅として開業。島式ホーム1面2線で貨物用ホームが設置されていた。

1924 4月20日

It was renamed Musashi-Koyama Station.

Machine translation — show Japanese original

武蔵小山駅に改称。

1925 11月

The station building was rebuilt with a reinforced concrete structure.

Machine translation — show Japanese original

鉄筋コンクリート造の駅舎に改築。

1937 2月

The freight line was abolished.

Machine translation — show Japanese original

貨物線撤去。

1974 6月1日

Automatic ticket gates were installed, consisting of three units for entry that accepted both regular and commuter passes, and one unit for exit that accepted commuter passes only.

Machine translation — show Japanese original

自動改札機設置。入場用×3基(普通乗車券・定期乗車券兼用)、出場用×1基(定期券専用)。

1995 10月4日

Work began on the continuous elevated crossing project for the section including this station between Meguro Station and Senzoku Station.

Machine translation — show Japanese original

当駅を含む目黒駅 - 洗足駅間の連続立体交差事業に事業着手

1997 7月17日

Improvement work results in a temporary bridge-style station building.

Machine translation — show Japanese original

改良工事に伴い、仮橋上駅舎となる。

2000 8月6日

The Mokko Line was split into the Meguro Line and the Tokyu Tamagawa Line, and the station became a station on the Meguro Line.

Machine translation — show Japanese original

目蒲線が目黒線と東急多摩川線に分割され、当駅は目黒線の駅となる。

2001 6月22日

Platform doors began to be used.

Machine translation — show Japanese original

ホームドアの使用を開始。

2006 7月2日

The station was relocated underground, changing from a single above-ground platform with two tracks to two underground platforms with four tracks.

Machine translation — show Japanese original

地下化。地上1面2線から地下2面4線に移設。

2009 5月

The station front plaza was completed.

Machine translation — show Japanese original

駅前広場が完成。

2010 9月17日

The station building opened.

Machine translation — show Japanese original

駅ビル開業。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (MG TOKYU MEGURO LINE)
1・2 Down
大岡山 · 日吉 · 新横浜
Platforms 1, 2 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Musashi-koyama Station FAQ

What train lines connect at Musashi-koyama Station?

Musashi-koyama Station is served by MG Tokyu Meguro Line.