Station History & Timeline
14 Events
2014 6月3日

JR East announced plans to establish a new station.

Machine translation — show Japanese original

JR東日本が新駅設置の計画を発表。

2016 9月6日

The overview of the station was announced, with the station positioned as a core facility in the Shinagawa redevelopment project "Global Gateway Shinagawa".

Machine translation — show Japanese original

当駅の概要を発表。当駅を品川再開発プロジェクト「グローバルゲートウェイ品川」の中核施設として位置づけた。

2017 2月10日

Work began on the construction of the station.

Machine translation — show Japanese original

当駅の工事に着手。

2018 6月5日

On June 30, a public solicitation for the station name was held, the first such solicitation by JR East.

Machine translation — show Japanese original

6月30日:駅名の公募が行われる。JR東日本から駅名の公募を行うのは初。

2018 6月17日

Track switching work was carried out on the southbound Keihin-Tohoku Line, resulting in the southbound track, which is in the direction of Yokohama, passing through the site of the new station.

Machine translation — show Japanese original

京浜東北線南行の線路切換工事を実施し、南行(横浜方面)の線路が新駅予定地を通過するようになる。

2018 12月4日

JR East decided on the station name "Takanawa Gateway Station".

Machine translation — show Japanese original

JR東日本が駅名を「高輪ゲートウェイ駅」に決定。

2019

Reiwa 1

Machine translation — show Japanese original

(令和元年)

2019 11月16日

The sections of the Yamanote Line and Keihin-Tohoku Line before and after the new station were suspended, and track switching work was carried out along with station improvement work at Shinagawa Station.

Machine translation — show Japanese original

新駅を挟んだ前後区間の山手線と京浜東北線を運休し、品川駅での駅改良工事と共に線路切換工事を実施。切換後は京浜東北線北行(東京方面)および山手線の電車も駅構内を通過するようになる。

2019 12月13日

The "Takanawa Gateway" was registered as a trademark by East Japan Railway (Registration No. 6206454).

Machine translation — show Japanese original

「高輪ゲートウェイ」が東日本旅客鉄道により商標登録される(第6206454号)。

2020 3月14日

The line opened on a provisional basis, with the opening commemoration event being cancelled due to COVID-19 infection prevention measures.

Machine translation — show Japanese original

暫定開業。開業記念イベントは新型コロナウイルス感染症(COVID-19)の流行に伴う感染拡大防止のため見送り。

2020 3月23日

Commercial facilities within the station premises opened, including the booth-type "STATION BOOTH" of the station-naka share office "STATION WORK".

Machine translation — show Japanese original

駅構内の商業施設が開店。駅ナカシェアオフィス「STATION WORK」のブース型「STATION BOOTH」が開設。

2020 10月1日

The station won the Good Design Award for the 2020 fiscal year.

Machine translation — show Japanese original

当駅が2020年度の「グッドデザイン賞」を受賞。

2025 3月27日

The station fully opened with the opening of TAKANAWA GATEWAY CITY Phase 1 (THE LINKPILLAR 1's north and south buildings), and the departure melody was changed to "Glorious Gateway -The Theme of TAKANAWA GATEWAY CITY-".

Machine translation — show Japanese original

駅に隣接するTAKANAWA GATEWAY CITY第1期(THE LINKPILLAR 1 南北両棟)の街びらきに伴い全面開業。同時に発車メロディを「Glorious Gateway -The Theme of TAKANAWA GATEWAY CITY-」に変更。

2025 10月1日

The Ekinet Q-Chike service was started.

Machine translation — show Japanese original

えきねっとQチケのサービスを開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (KEIHIN–TŌHOKU LINE)
3 Up
東京 · 上野 · 浦和
4 Down
品川 · 蒲田 · 横浜
Platforms 3, 4 serve this line
PLATFORM LAYOUT (YAMANOTE LINE)
1 Up
東京 · 上野 · 巣鴨
2 Down
渋谷 · 新宿 · 池袋
Platforms 1, 2 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Takanawa Gateway Station FAQ

What train lines connect at Takanawa Gateway Station?

Takanawa Gateway Station is served by Keihin–Tōhoku Line, Yamanote Line.