赤塚駅
Akatsuka Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
20 Events
1894
1月4日
It opened as a station on the Nippon Railway.
Machine translation — show Japanese original
日本鉄道の駅として開業。
1906
11月1日
Nippon Railway was nationalized and became part of the government railway.
Machine translation — show Japanese original
日本鉄道が国有化され、官設鉄道の所属となる。
1909
10月12日
The line came under the Jōban Line due to the designation of line names.
Machine translation — show Japanese original
線路名称制定により常磐線の所属となる。
1926
10月24日
The Ibaraki Railway Line, later the Ibaraki Transportation Ibaraki Line, opened.
Machine translation — show Japanese original
茨城鉄道線(後の茨城交通茨城線)が開通。
1949
6月1日
Japanese National Railways was established.
Machine translation — show Japanese original
日本国有鉄道が発足。
1971
2月11日
In 1971, the Ibaraki Line was abolished.
Machine translation — show Japanese original
1971年:茨城線が廃止。
1985
3月14日
Freight handling was abolished.
Machine translation — show Japanese original
荷物扱い廃止。
1987
4月1日
With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East) and Japan Freight Railway Company (JR Freight).
Machine translation — show Japanese original
国鉄分割民営化により、東日本旅客鉄道(JR東日本)・日本貨物鉄道(JR貨物)の駅となる。
1990
7月
A dedicated line to the Nikkan Flour Milling and Showa Sangyo Mito factory, which was located south of the station, was formerly in operation, with grain transport trains using the HoKi 2200 form running from Okawa Station, but was abolished due to the factory's closure at the end of 1990.
Machine translation — show Japanese original
かつて駅南側に広がっていた日清製粉、昭和産業水戸工場へ専用線が続いていた。大川駅からホキ2200形を使用する穀物輸送列車が運行されていたが、1990年末に工場が閉鎖されたため廃止された。
1991
4月1日
Freight train service was abolished.
Machine translation — show Japanese original
貨物列車の設定廃止。
1998
10月9日
Work began on rebuilding the station building.
Machine translation — show Japanese original
駅舎改築工事に着手。
1999
4月1日
The free passage was completed.
Machine translation — show Japanese original
自由通路が完成。
1999
11月21日
The temporary use of the elevated station building began.
Machine translation — show Japanese original
橋上駅舎の仮使用開始。
2000
3月24日
The new station building and station plaza among other facilities began full operation.
Machine translation — show Japanese original
新駅舎・駅前広場など全面供用開始。
2000
10月20日
The train-linked escalator, which changes its direction of operation to match train arrivals and departures, began operating.
Machine translation — show Japanese original
列車が発着に合わせて運転方向が変わる列車連動型エスカレーターの供用開始。
2001
11月18日
The IC card Suica service began operation.
Machine translation — show Japanese original
ICカードSuica供用開始。
2005
12月10日
The Japanese National Railways station was abolished.
Machine translation — show Japanese original
日本貨物鉄道の駅が廃止。
2015
4月1日
It becomes an outsourced station with JR Mito Railway Service commissioned to handle station operations.
Machine translation — show Japanese original
JR水戸鉄道サービスが駅業務を受託する業務委託駅となる。
2016
7月1日
Station operations were transferred to JR East Station Service.
Machine translation — show Japanese original
駅業務受託がJR東日本ステーションサービスへ移管。
2024
2月29日
The Midori no Madoguchi service ended operations.
Machine translation — show Japanese original
みどりの窓口の営業を終了。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Akatsuka Station FAQ
What train lines connect at Akatsuka Station?
Akatsuka Station is served by .