調布駅

chfu Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
17 Events
1913 4月15日

It opened as a station on the Keio Electric Railway.

Machine translation — show Japanese original

京王電気軌道の駅として開業。

1916 6月1日

A branch line opened between this station and Tamagawabara Station (now Keiō Tamagawa Station), which was later extended as the Sagamihara Line.

Machine translation — show Japanese original

当駅 - 多摩川原駅(現在の京王多摩川駅)間の分岐線が開業(のち相模原線として延伸)。

1929

A north-south pedestrian underpass for students commuting to school was built near the former Chōfu Elementary School, on the Hachiōji side of Chōfu Station.

Machine translation — show Japanese original

調布駅の八王子寄り(旧・調布尋常高等小学校付近)に児童通学用の南北横断地下道が造られる。

1944 5月31日

It was merged into Tokyo Kyuko Electric Railway (Daiei Kyuko) and became a station on the company's Keio Line.

Machine translation — show Japanese original

東京急行電鉄(大東急)に併合。同社京王線の駅となる。

1948 6月1日

Keio Teito Electric Railway was spun off from Tokyu, and the station became part of the company.

Machine translation — show Japanese original

東急から京王帝都電鉄が分離。同社の駅となる。

1953 12月10日

It was relocated to its current location.

Machine translation — show Japanese original

現在地に移設。

1971 4月1日

The Sagamihara Line extended to Keio-Yomiuri Land Station.

Machine translation — show Japanese original

相模原線、京王よみうりランド駅まで開業。

1981 10月20日

The east exit was opened.

Machine translation — show Japanese original

東口が開設される。

2001 3月27日

With the timetable revision, a semi-express service was newly established and the station became a stop on the route.

Machine translation — show Japanese original

ダイヤ改定により準特急が新設され、停車駅となる。

2008 9月14日

The provisional bridge-style station building began operation.

Machine translation — show Japanese original

仮設橋上駅舎使用開始。

2008 11月16日

The east exit is open all day.

Machine translation — show Japanese original

東口が終日営業となる。

2012 8月19日

The station was converted to an underground station as part of the continuous grade separation project and its train arrival melody was changed to Ikimono-gakari's "Arigatou".

Machine translation — show Japanese original

連続立体交差事業により地下駅へ切り替え。列車接近メロディをいきものがかりの「ありがとう」に変更。

2012 9月1日

Platform doors began to be used.

Machine translation — show Japanese original

ホームドアの使用を開始。

2014

The consecutive elevated crossing project near Chōfu Station was completed.

Machine translation — show Japanese original

度 - 調布駅付近連続立体交差事業完了。

2017 9月29日

The station building "Trie Keio Chofu" opened.

Machine translation — show Japanese original

駅ビル「トリエ京王調布」がオープン。

2021 8月19日

A subsidiary station name "Denki Tsushin University Nearest Station" was established.

Machine translation — show Japanese original

副駅名称として「電気通信大学 最寄駅」を設置。

2026 3月

The Chofu Station front square development plan was completed.

Machine translation — show Japanese original

調布駅前広場整備計画完成。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
ありがとう いきものがかり
Keio Line 全ホーム共通 since 2012年8月19日

調布市が舞台のNHK(日本放送協会)連続テレビ小説『ゲゲゲの女房』の主題歌。同駅地下化に合わせ、桐朋学園大学音楽学部が演奏したメロディを採用。

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

chfu Station FAQ

What train lines connect at chfu Station?

chfu Station is served by .