五井
Goi Station
Live Network Status Active
Goi is a railway station in Tokyo.
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
18 Events
1912
3月28日
The line opened.
Machine translation — show Japanese original
開業。
1925
3月7日
The Kominato Railway Line opened.
Machine translation — show Japanese original
小湊鉄道線が開業。
1974
10月1日
Freight handling was abolished.
Machine translation — show Japanese original
貨物取扱廃止。
1975
4月16日
The Midori-no-Madoguchi ticket office began operations.
Machine translation — show Japanese original
みどりの窓口の営業を開始。
1978
8月26日
The elevated station building was completed.
Machine translation — show Japanese original
橋上駅舎完成。
1982
11月15日
It becomes a limited express stop.
Machine translation — show Japanese original
特急停車駅となる。
1986
3月3日
Freight handling was abolished.
Machine translation — show Japanese original
荷物扱い廃止。
1987
4月1日
With the privatization of Japanese National Railways, the station became a station of East Japan Railway Company (JR East).
Machine translation — show Japanese original
国鉄分割民営化に伴い、国鉄の駅は東日本旅客鉄道(JR東日本)の駅となる。
1994
12月17日
Automatic ticket gates were installed and put into service.
Machine translation — show Japanese original
自動改札機を設置し、供用開始。
1999
3月
JR East installed two new escalators connecting the platform and concourse at its station.
Machine translation — show Japanese original
JR東日本の駅にホームとコンコースを結ぶエスカレーターを2基新設
2001
11月18日
IC card "Suica" becomes available for use on JR East.
Machine translation — show Japanese original
JR東日本でICカード「Suica」の利用が可能となる。
2009
3月14日
Simple Suica ticket gates were installed at the transfer points between the JR line and the Kominato Railway line.
Machine translation — show Japanese original
JR線と小湊鉄道線の乗り換え口に簡易Suica改札機を設置。
2011
11月14日
Renovation work on the concourse toilets was carried out as part of improvement construction.
Machine translation — show Japanese original
改良工事に伴い、コンコースのトイレを改修。
2014
In conjunction with the Ichihara Art Mix festival, a ticket counter and intermediate ticket gate were established on the JR side of the stairs connecting the JR line and the Kominato Railway line.
Machine translation — show Japanese original
芸術祭「いちはらアート・ミックス」に際し、JR線と小湊鐡道線との乗換階段の片方(JR改札側)に出札窓口と中間改札が設けられる。
2015
10月1日
The connecting overpass on the Kimitsu side was taken out of service due to aging.
Machine translation — show Japanese original
老朽化により君津寄りの連絡跨線橋が供用停止となる。
2016
11月18日
The Kominato Railway's Goi Locomotive Depot engine shed and blacksmith shop were designated as registered tangible cultural properties of the country.
Machine translation — show Japanese original
小湊鉄道の五井機関区機関庫及び鍛冶小屋が国の登録有形文化財に答申される。
2017
5月2日
The Koi locomotive depot and blacksmith shop of Kominato Railway's Goi locomotive depot were formally registered as national registered tangible cultural properties.
Machine translation — show Japanese original
小湊鉄道の五井機関区機関庫及び鍛冶小屋が国の登録有形文化財に正式登録される。
2022
10月31日
The Midori no Madoguchi service ended operations.
Machine translation — show Japanese original
みどりの窓口の営業を終了。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (UCHIBŌ LINE)
1
Up
蘇我 · 千葉 · 東京
2
Down
木更津 · 館山 · 安房鴨川
↕ Platforms 1, 2 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Goi Station FAQ
What train lines connect at Goi Station?
Goi Station is served by Uchibō Line.