萩山駅

Hagiyama Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
8 Events
1928 4月6日

The line opened.

Machine translation — show Japanese original

開業。

1958 9月16日

It was relocated to its current location.

Machine translation — show Japanese original

現在地に移転。

1967 11月

The elevated station was completed.

Machine translation — show Japanese original

橋上駅完成。

1990 3月31日

The elevated station building expansion and renovation was completed.

Machine translation — show Japanese original

橋上駅舎増改築完成。

1992

Automatic ticket gates were installed and a crossover from track 3 to Kokubunji was added, with the location being relocated to its current site.

Machine translation — show Japanese original

ごろ - 自動改札機設置、3番線から国分寺への渡り線が設けられて現在地に移転。

2009

Elevator installation work, roof replacement work, and updates to station guide signs were implemented.

Machine translation — show Japanese original

エレベーター設置工事と屋根の葺き替え工事および駅案内サインの更新を実施。

2010 5月1日

The regular ticket sales office was abolished.

Machine translation — show Japanese original

定期券売り場を廃止。

2013 3月16日

The coupling and decoupling operations at Hagiya Station were abolished for both the Haijima and Seibu Yuenchi directions.

Machine translation — show Japanese original

萩山駅での増結・解結作業を廃止(拝島方面及び西武遊園地方面)。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Hagiyama Station FAQ

What train lines connect at Hagiyama Station?

Hagiyama Station is served by .