旗の台

Hatanodai Station

Live Network Status Active

Hatanodai is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
13 Events
1927 7月6日

The Higashi-Senzoji Station on the Meguro-Kamata Electric Railway's Oimachi Line was opened.

Machine translation — show Japanese original

目黒蒲田電鉄大井町線の東洗足駅が開設。

1927 8月28日

Ikegami Electric Railway's Hatakegaoka Station was opened.

Machine translation — show Japanese original

池上電気鉄道の旗ヶ岡駅が開設。

1945 5月

Hatakegawa Station was completely burned down due to an air raid.

Machine translation — show Japanese original

旗ヶ岡駅が空襲に伴い、全焼。

1951 3月1日

Higashi-Senzu station was renamed to Hatonoda station and relocated to its current location.

Machine translation — show Japanese original

東洗足駅を旗の台駅へ改称。同時に現在地へ移設。

1951 5月1日

Hatakeoka Station was merged with Hatanodai Station, and the Ikegami Line station facilities were relocated to their current location.

Machine translation — show Japanese original

旗ヶ岡駅が旗の台駅と統合。同時に池上線駅設備を現在地へ移設。

2002 1月

The station improvement work commenced.

Machine translation — show Japanese original

駅改良工事着工

2005 7月11日

The Flag's Gate No. 1 crossing adjacent to the north exit ticket gate was abolished and switched to an underground passage.

Machine translation — show Japanese original

北口改札に隣接して設置されていた旗の台1号踏切道廃止、地下道へ切替。

2005 11月27日

The down line of the Oimachi Line was relocated to the new platform.

Machine translation — show Japanese original

大井町線下り線が新設ホームへ移転。

2006 3月26日

The up platform on the Oimachi Line was switched to an island platform, with the north exit ticket gate being abolished at the same time.

Machine translation — show Japanese original

大井町線上りホーム切替、島式ホームへ一度集約すると共に、北口改札廃止。

2007 5月27日

The up platform on the Oimachi Line was relocated to the Gotanda side of the Ikegami Line and was made barrier-free in the same month.

Machine translation — show Japanese original

大井町線上りホームを池上線五反田寄りに移設。この同年月にバリアフリー化。

2008 3月

The station improvement work was completed, and the express train passing facility was put into use at the same time.

Machine translation — show Japanese original

駅改良工事完成。同時に急行待避施設使用開始。

2009 11月30日

The ticket counter for regular tickets has closed.

Machine translation — show Japanese original

定期券うりば営業終了。

2019 8月1日

In 2019, the renovation of the Ikugao Line platform, dubbed "Wooden Renewal," which retained the atmosphere of the former wooden station building, was completed.

Machine translation — show Japanese original

(令和元年):池上線ホームにおいて木造駅舎の雰囲気を踏襲した「木になるリニューアル」が竣工。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (IK TOKYU IKEGAMI LINE)
1 Down
雪が谷大塚 · 蒲田
2 Up
五反田
Platforms 1, 2 serve this line

Transfers from this platform

OM Tokyu Oimachi Line Tokyu
2 min Easy
PLATFORM LAYOUT (OM TOKYU OIMACHI LINE)
3・4 Down
自由が丘 · 二子玉川 · 溝の口
5・6 Up
大井町
Platforms 3, 4, 5, 6 serve this line

Transfers from this platform

IK Tokyu Ikegami Line Tokyu
2 min Easy

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Hatanodai Station FAQ

What train lines connect at Hatanodai Station?

Hatanodai Station is served by IK Tokyu Ikegami Line, OM Tokyu Oimachi Line.