平沼橋駅
Hiranumabashi Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
5 Events
1931
10月25日
The station opened on the side track of the Ministry of Railways line, currently the JR line, on the south side of the former Hiratsuka Station, and served as the starting station until the line was extended to Yokohama Station in December 1933.
Machine translation — show Japanese original
鉄道省線(現・JR線)の側線を借り、平沼駅跡地の南側に開業。1933年(昭和8年)12月横浜駅まで延伸するまでの間、当駅が始発駅だった。
1957
1月18日
The station underwent doubling of tracks after receiving the transfer of the Japanese National Railways freight line, and remnants of this can be seen in the overhead line poles standing on the station platform that span the JR line and the down line of the Sotetsu main line.
Machine translation — show Japanese original
国鉄貨物線の譲渡を受け複線化。当駅ホーム上にJR線及び相鉄本線下り線を跨ぐ架線柱が立っているのはその名残である。
1970
12月26日
The elevated station building was completed.
Machine translation — show Japanese original
橋上駅舎完成。
2017
1月16日
The station building renovation, part of the Sotetsu Design Brand Up Project, has been completed.
Machine translation — show Japanese original
相鉄デザインブランドアッププロジェクトの一環で実施されていた駅舎(内外装など)のリニューアルが完成。
2024
3月24日
Platform doors began to be used.
Machine translation — show Japanese original
ホームドアの使用を開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Hiranumabashi Station FAQ
What train lines connect at Hiranumabashi Station?
Hiranumabashi Station is served by .