平山駅

Hirayama Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
8 Events
1936 3月25日

The station opened when the line was extended from Kuruji to Kazusa-Kameyama.

Machine translation — show Japanese original

久留里 - 上総亀山間延伸時に開業。

1944 12月16日

It was closed due to the suspension of service on the Kururi - Kazusa-Kameyama section.

Machine translation — show Japanese original

久留里 - 上総亀山間の営業休止に伴い休止。

1947 7月1日

Operations resumed.

Machine translation — show Japanese original

営業再開。

1954 9月16日

Freight handling was abolished and the station became unstaffed.

Machine translation — show Japanese original

荷物扱い廃止。無人駅となる。

1982 4月

The current station building was put into use.

Machine translation — show Japanese original

現在の駅舎を使用開始。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。

2009 3月14日

It was incorporated into the Tokyo suburban area.

Machine translation — show Japanese original

東京近郊区間に編入される。

2027 4月1日

The station is scheduled to be closed due to the abolition of the Kururi - Kazusa-Kameyama section.

Machine translation — show Japanese original

久留里 - 上総亀山間の廃止に伴い廃駅となる(予定)。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Hirayama Station FAQ

What train lines connect at Hirayama Station?

Hirayama Station is served by .