いずみ中央駅
Izumi-chūō Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
7 Events
1990
4月4日
The station opened, and at the time it was the terminal station.
Machine translation — show Japanese original
開業。当時は終着駅であった。
1993
4月21日
Sagami Railway's Sagami Line and the Ministry of Railways line connected at the newly opened Sagami Railway's Atsugi Station, and the company began operating the Sagami Railway's Atsugi-Yokohama route, Sagami Railway renamed itself to Sagami Railway Co., Ltd. and started the Sagami Railway's operation, is incorrect, instead: Sotetsu Lifeline, or Sotetsu Life, opened.
Machine translation — show Japanese original
「相鉄ライフ」が開業。
1999
2月27日
Rapid service commenced, with the station becoming a stop.
Machine translation — show Japanese original
快速の運転が開始され、当駅が停車駅となる。
1999
3月10日
With the extension and opening of the section between this station and Shonandai Station, it became an intermediate station.
Machine translation — show Japanese original
当駅 - 湘南台駅間延伸開業により、途中駅となる。
2000
12月
The service center "Green Pocket" was closed.
Machine translation — show Japanese original
サービスセンター「グリーンぽけっと」閉鎖。
2017
3月8日
A waiting room was installed on the platform.
Machine translation — show Japanese original
ホームに待合室を設置。
2023
4月19日
Platform doors began to be used.
Machine translation — show Japanese original
ホームドアの使用を開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Izumi-chūō Station FAQ
What train lines connect at Izumi-chūō Station?
Izumi-chūō Station is served by .