上石神井駅
Kami-Shakujii Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
7 Events
1927
4月16日
The line opened.
Machine translation — show Japanese original
開業。
1960
Around the first half of the Taisho period, the station was modified from an island platform with 2 tracks to an island platform with 3 tracks.
Machine translation — show Japanese original
代]]前半頃 - 島式ホーム1面2線を島式ホーム2面3線に変更。
1965
3月7日
The elevated station building was completed.
Machine translation — show Japanese original
橋上駅舎が完成する。
1993
9月1日
Automatic ticket gates were put into use.
Machine translation — show Japanese original
自動改札機の使用を開始する。
1995
An escalator is installed at the south entrance.
Machine translation — show Japanese original
頃 - 南口にエスカレーターが設置される。
2004
2月13日
Barrier-free construction work, including the installation of elevators and the relocation and renovation of toilets, was completed.
Machine translation — show Japanese original
エレベーターの設置、トイレの移設・改装など、バリアフリー化工事完成。
2012
3月2日
The sales window for regular tickets has ended its business.
Machine translation — show Japanese original
定期券発売窓口の営業を終了する。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Kami-Shakujii Station FAQ
What train lines connect at Kami-Shakujii Station?
Kami-Shakujii Station is served by .