上石神井駅

Kami-Shakujii Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
7 Events
1927 4月16日

The line opened.

Machine translation — show Japanese original

開業。

1960

Around the first half of the Taisho period, the station was modified from an island platform with 2 tracks to an island platform with 3 tracks.

Machine translation — show Japanese original

代]]前半頃 - 島式ホーム1面2線を島式ホーム2面3線に変更。

1965 3月7日

The elevated station building was completed.

Machine translation — show Japanese original

橋上駅舎が完成する。

1993 9月1日

Automatic ticket gates were put into use.

Machine translation — show Japanese original

自動改札機の使用を開始する。

1995

An escalator is installed at the south entrance.

Machine translation — show Japanese original

頃 - 南口にエスカレーターが設置される。

2004 2月13日

Barrier-free construction work, including the installation of elevators and the relocation and renovation of toilets, was completed.

Machine translation — show Japanese original

エレベーターの設置、トイレの移設・改装など、バリアフリー化工事完成。

2012 3月2日

The sales window for regular tickets has ended its business.

Machine translation — show Japanese original

定期券発売窓口の営業を終了する。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kami-Shakujii Station FAQ

What train lines connect at Kami-Shakujii Station?

Kami-Shakujii Station is served by .