上総中野駅

Kazusa-Nakano Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
12 Events
1928 5月16日

It was opened by Kominato Railway.

Machine translation — show Japanese original

小湊鉄道により開業。

1934 8月26日

The Ministry of Railways line (Japanese National Railways) Kihara Line opened, as a general station.

Machine translation — show Japanese original

鉄道省(国鉄)木原線が開業、一般駅。

1974 10月1日

The Japanese National Railways Kihara Line ceased freight operations and became a passenger station.

Machine translation — show Japanese original

国鉄木原線の貨物営業廃止、旅客駅となる。

1984 2月1日

The Japanese National Railways Kihara Line ceased its freight operations.

Machine translation — show Japanese original

国鉄木原線の荷物営業廃止。

1987 4月1日

With the privatization of Japanese National Railways, it became the JR East Kihara Line.

Machine translation — show Japanese original

国鉄分割民営化により、JR東日本木原線となる。

1988 3月24日

The JR Kihara Line was converted to the Isumi Railway Isumi Line, and at the same time it became an unmanned station, and the Kominato Railway Line switched to staff closing.

Machine translation — show Japanese original

JR木原線がいすみ鉄道いすみ線に転換される。同時に無人駅となり小湊鉄道線がスタフ閉塞になる。

1989

In 1989, the station building was rebuilt.

Machine translation — show Japanese original

(平成元年):駅舎改築。

2013 10月16日

Due to the effects of Typhoon 26, the Kominato Railway Line was suspended, and the section between Yoro Keikoku Station and the current station was operated by a substitute bus due to landslides and other issues.

Machine translation — show Japanese original

台風26号の影響で小湊鉄道線運休。土砂崩れ等で養老渓谷駅 - 当駅間が代行バスによる運行となる。

2014 3月20日

Operations were resumed on the section between Yōrō Keikoku Station and this station.

Machine translation — show Japanese original

養老渓谷駅 - 当駅間の運行を再開。

2019 10月25日

In 2019, heavy rain caused the entire Kominato Railway Line to be suspended.

Machine translation — show Japanese original

(令和元年):この日の大雨で小湊鐵道線全線運休。

2020 1月27日

The entire Kominato Railway line resumed operation on this day.

Machine translation — show Japanese original

この日をもって小湊鐵道線全線運行再開。

2024 10月4日

A derailment accident occurred on the Isumi Railway Isumi Line, resulting in bus replacement services thereafter.

Machine translation — show Japanese original

いすみ鉄道いすみ線で脱線事故が発生。以後バス代行となる。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kazusa-Nakano Station FAQ

What train lines connect at Kazusa-Nakano Station?

Kazusa-Nakano Station is served by .