Kishibe

Kishibe Station

日本語で読む

Kishibe Station (岸辺駅) in Suita, Osaka, is run by West Japan Railway Company and is on the JR Kyoto Line. It opened on 11 April 1947.

History

Kishibe opened on 11 April 1947 as a passenger-only stop between Senrioka and Suita stations, near the Suita marshalling yard. On 6 June 1947 an imperial train arrived at and left from Kishibe, when Emperor Showa visited the Suita yard. A reinforced concrete station building was finished on 25 June 1970.

Luggage handling ended on 1 February 1984. On 1 April 1987 the station passed to West Japan Railway Company (JR West). On 13 March 1988 the line was given the name JR Kyoto Line (JR京都線). Automatic ticket gates came into use on 19 July 1997.

A train control system and display boards were added to the platforms on 29 July 2002. ICOCA became usable on 1 November 2003. The station was moved into a bridge station building in stages. On 17 October 2009 the ticket office and gates were moved, and on 17 January 2010 some platforms were moved to temporary platforms. On 17 March 2012 the bridge station opened in temporary use, with lifts, escalators and a Midori ticket machine. The north exit and north station square opened on 21 May 2012.

Heart-In (ハート・イン) opened inside the station on 23 September 2013. An arrival melody was introduced on 12 March 2015. The south square renovation was finished on 14 March 2015, which completed the bridge station project. Station numbering began on 17 March 2018. On 17 November 2018 the commercial building VIERRA岸辺健都 opened north of the station, linked to the concourse by a long north-south passage.

The Midori ticket window closed on 30 November 2021. From 1 December 2021 Midori Ticket Machine Plus (みどりの券売機プラス) machines were in use.

See all 22 dated events in the Data view →

Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
22 Events
1947 4月11日

The station opened on the Japanese National Railways Tokaido Main Line between Senrioka Station and Suita Station, near Suita Yard, handling only passenger traffic.

Machine translation — show Japanese original

国有鉄道東海道本線の千里丘駅 - 吹田駅間(吹田操車場付近)に新設開業。旅客扱いのみ。

1947 6月6日

The Shōwa Emperor visited Ōsaka Freight Terminal on an imperial tour after the war, with the imperial train arriving and departing at Kishibe Station.

Machine translation — show Japanese original

昭和天皇が吹田操車場に行幸(昭和天皇の戦後巡幸)、お召し列車が岸辺駅に発着。

1970 6月25日

The old reinforced concrete station building was completed and put into use.

Machine translation — show Japanese original

鉄筋コンクリートの旧駅舎が完成し、使用を開始。

1984 2月1日

Freight handling was abolished.

Machine translation — show Japanese original

荷物扱い廃止。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of West Japan Railway Company (JR West).

Machine translation — show Japanese original

国鉄分割民営化により、西日本旅客鉄道(JR西日本)の駅となる。

1988 3月13日

The line nickname was established, and the nickname "JR Kyoto Line" started being used.

Machine translation — show Japanese original

路線愛称の制定により、「JR京都線」の愛称を使用開始。

1997 7月19日

Automatic ticket gates were installed and put into service.

Machine translation — show Japanese original

自動改札機を設置し、供用開始。

2002 7月29日

The JR Kyoto and Kobe lines introduced an operating management system and installed electronic display boards on the platforms.

Machine translation — show Japanese original

JR京都・神戸線運行管理システム導入。ホームに電光掲示板設置。

2003 11月1日

The IC card "ICOCA" becomes available for use.

Machine translation — show Japanese original

ICカード「ICOCA」の利用が可能となる。

2007 3月18日

The automatic station broadcasts were updated.

Machine translation — show Japanese original

駅自動放送を更新。

2008 2月20日

An electronic display board was installed at the ticket gate.

Machine translation — show Japanese original

改札口に電光掲示板設置。

2009 10月17日

The locations of the ticket window and ticket gate were changed as part of the elevation of the station building, which resulted in the partial demolition of the old station building.

Machine translation — show Japanese original

橋上駅舎化に伴い、旧駅舎の一部が削られるため、窓口と改札口の位置が変更される。

2010 1月17日

With the elevation of the station building, the 2nd platform was temporarily relocated one car length and the 3rd platform was temporarily relocated two car lengths.

Machine translation — show Japanese original

橋上駅舎化に伴い、2番のりばを1両分、3番のりばを2両分仮ホームに移設。

2012 3月17日

The elevated station building began temporary operation, with the introduction of Midori no Madoguchi ticket vending machines, elevators, and escalators, and the platforms were relocated two cars towards the Takatsuki and Kyoto direction upon completion of the platform elevation work.

Machine translation — show Japanese original

橋上駅舎が仮供用開始。同時にみどりの券売機、エレベーター、エスカレーターが供用開始。ホームのかさ上げ工事が完成すると同時にホームを高槻・京都方面へ2両分移設。

2012 5月21日

The north exit was opened and the north exit station plaza was put into service.

Machine translation — show Japanese original

北口開設。北口駅前広場が供用開始。

2013 9月23日

A Heart-In store opened within the station premises.

Machine translation — show Japanese original

駅構内にハート・インが開店。

2015 3月12日

Introduction of approaching melodies accompanied the revision of the entry warning sound.

Machine translation — show Japanese original

入線警告音の見直しに伴い、接近メロディ導入。

2015 3月14日

The renovation work on the south entrance station plaza was completed, marking the completion of the elevated station building project.

Machine translation — show Japanese original

南口駅前広場の改修工事が完成。これにより、橋上駅舎化事業がすべて完了。

2018 3月17日

Station numbering was introduced.

Machine translation — show Japanese original

駅ナンバリングを導入。

2018 11月17日

A commercial facility called VIERRA Kishibe Kento opened to the north of the station, directly connected to the station concourse by a newly constructed north-south free passage over 100 meters long.

Machine translation — show Japanese original

駅北側に商業施設「VIERRA岸辺健都」が開業。駅コンコースと新たに建設した100 mを超える長さの南北自由通路で直結。

2021 11月30日

On this day, the Midori-no-Madoguchi ticket counters ceased operations.

Machine translation — show Japanese original

この日をもってみどりの窓口が営業終了。

2021 12月1日

The Midori no Kiokuji Plus ticket vending machine started operation.

Machine translation — show Japanese original

みどりの券売機プラスが稼働開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Nearby landmarks not documented yet
Accessibility
Step-free access and facilities not documented yet

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kishibe Station FAQ

What train lines connect at Kishibe Station?

Kishibe Station is served by .