葛生駅

Kuzū Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
12 Events
1889 6月23日

The Ashio Horse Railway's temporary Ashio - Yoshimizu section opened.

Machine translation — show Japanese original

安蘇馬車鉄道の(仮)生 - 吉水間が開業 。

1890 4月10日

Nami opened, and operations began to (old) Sano, and (temporary) Nami Station was abolished.

Machine translation — show Japanese original

生 - (仮)生間が開業し、(旧)佐野までの運転開始。(仮)生駅廃止。

1894 3月20日

The horse-drawn railway between Oo and Etanakashi was abolished, the railway between Oo and Etanakashi opened as the Satono Railway, and Oo Station reopened as a station on the Satono Railway.

Machine translation — show Japanese original

生 - 越名河岸間の馬車鉄道廃止。佐野鉄道として生 - 越名河岸間の鉄道開業し、佐野鉄道の生駅として改めて開業。

1912 3月30日

Tobu Railway merged with Sano Railway and made it the Sano Line.

Machine translation — show Japanese original

東武鉄道が佐野鉄道を合併、佐野線とする。

1914 10月16日

With the completion of the gauge conversion from 2 feet 6 inches to 3 feet 6 inches on the former Sano Railway section, direct operation between Tachibana and Ikuma began.

Machine translation — show Japanese original

旧佐野鉄道区間の改軌(2フィート6インチより3フィート6インチ)完了により、館林 - 生間直通運転開始。

1986 10月21日

Freight handling was abolished.

Machine translation — show Japanese original

貨物取扱いを廃止。

1997 10月1日

The section between Aizawa Line and Kamishiroishi Station was abolished.

Machine translation — show Japanese original

会沢線当駅 - 上白石駅間廃止。

2007 3月18日

The IC card "PASMO" becomes available for use.

Machine translation — show Japanese original

ICカード「PASMO」の利用が可能となる。

2012 3月17日

The TI 39 introduced station numbering.

Machine translation — show Japanese original

TI 39の駅ナンバリングを導入。

2013 7月

A megasolar facility with a maximum output of approximately 1,000 kW began operating on the site of the former Tōbu Railway freight yard south of the station.

Machine translation — show Japanese original

駅南側の東武鉄道の鉄道貨物ヤード跡地にて、最大出力約1,000 kWのメガソーラーが稼働開始。

2014 9月27日

The new station building was put into use.

Machine translation — show Japanese original

新駅舎の使用を開始。

2025 10月9日

The use of passenger toilets made with recycled aluminum building materials extracted from retired N700 series Tokaido Shinkansen trains began.

Machine translation — show Japanese original

東海道新幹線N700系の廃車発生品から抽出したリサイクルアルミの建築建材を用いた旅客トイレの使用を開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kuzū Station FAQ

What train lines connect at Kuzū Station?

Kuzū Station is served by .