蒔田駅

Maita Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
6 Events
1971 3月16日

Prior to the opening on November 29, 1000 series vehicles were transported from Kamakura Highway near the station to the underground tunnel, with one vehicle being transported per night.

Machine translation — show Japanese original

から11月29日 - 開業に先かけて当駅付近の鎌倉街道から地下トンネル内に1000形車両を搬入。搬入作業は夜間に1日1両であった(全21両)。

1972 12月16日

The line opened.

Machine translation — show Japanese original

開業。

2007 6月23日

Platform doors began to be used.

Machine translation — show Japanese original

ホームドアの使用を開始。

2009 4月4日

Elevators connecting the platform and ticket gates and multi-functional toilets began operating.

Machine translation — show Japanese original

ホームと改札口を結ぶエレベーターと多機能トイレの供用を開始。

2012 3月31日

The No. 3 exit and ticket gate, as well as the escalators and elevators connecting the exit and ticket gate, began operating.

Machine translation — show Japanese original

3番出入口と改札口、および出入口と改札口を結ぶエスカレーター・エレベーターの供用を開始。

2012 4月10日

The docomo Wi-Fi public wireless LAN service began.

Machine translation — show Japanese original

docomo Wi-Fiによる公衆無線LANサービス開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Maita Station FAQ

What train lines connect at Maita Station?

Maita Station is served by .