武蔵藤沢駅
Musashi-Fujisawa Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
6 Events
1926
4月1日
It opened as a station on Musashino Railway, the predecessor to Seibu Railway.
Machine translation — show Japanese original
西武鉄道の前身となる武蔵野鉄道の駅として開業。
1998
9月30日
The station building improvement work was completed and the station transitioned from a single island platform with two tracks to two side platforms with two tracks.
Machine translation — show Japanese original
駅舎改良工事が完了し、島式ホーム1面2線から相対式ホーム2面2線へ移行。
2007
2月4日
Work began on station building improvement (full-scale reconstruction accompanying elevation and the construction of east-west free passage).
Machine translation — show Japanese original
駅舎改良工事(橋上化および東西自由通路新設に伴う全面改築)開始。
2008
2月9日
The new station building began operation.
Machine translation — show Japanese original
新駅舎利用開始。
2008
4月14日
The pedestrian bridge began to be used in conjunction with the opening of the pick-up and drop-off area.
Machine translation — show Japanese original
送迎用乗降場の開放に伴い、連絡橋の使用を開始。
2024
4月1日
The station was changed to a remotely controlled station with guidance by station staff via interphone, and ticket sales at the counter were discontinued.
Machine translation — show Japanese original
駅係員によるインターホンでご案内する遠隔対応駅へ変更するとともに、窓口での切符等の販売を終了。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Musashi-Fujisawa Station FAQ
What train lines connect at Musashi-Fujisawa Station?
Musashi-Fujisawa Station is served by .