西葛西

Nishi-Kasai Station

Live Network Status Active

Nishi Kasai is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
12 Events
1977 11月

Construction on the new station began.

Machine translation — show Japanese original

駅新設工事着工。

1979 10月1日

The line opened.

Machine translation — show Japanese original

開業。

1997

Large-scale renovation work began, with construction starting on the underground bicycle parking lot at the station's north exit.

Machine translation — show Japanese original

大規模改良工事開始。駅北口地下駐輪場建設工事に着手。

1999 3月

Work began on station improvement projects mainly focusing on platform expansion, and the underground bicycle parking lot at the station's north exit was completed.

Machine translation — show Japanese original

ホーム拡幅を主とした駅本体の改良工事に着手。駅北口地下駐輪場が完成。

1999 10月1日

The new stairs at the south and north entrances were put into service, and the station office was relocated to the second floor above the new south entrance stairs.

Machine translation — show Japanese original

南口・北口新階段が使用開始。駅事務所が2階南口新階段上に移転。

2000 4月1日

Major renovation work was completed, a waiting room was installed on the platform, and an underground bicycle parking lot was completed at the south exit of the station.

Machine translation — show Japanese original

大規模改良工事完了。ホームに待合室設置。駅南口地下駐輪場が完成。

2001 3月24日

The "Nishikasai Metropia" opened within the station premises, and the cafe "Denmark" began operating.

Machine translation — show Japanese original

駅構内に「西葛西メトロピア」がオープン。カフェ「デンマルク」開業。

2004 4月1日

With the privatization of Teito Kōsoku Tetsudō Kōdan (Eidan Subway), the station was inherited by Tokyo Metro.

Machine translation — show Japanese original

帝都高速度交通営団(営団地下鉄)民営化に伴い、当駅は東京地下鉄(東京メトロ)に継承される。

2007 3月18日

The IC card "PASMO" becomes available for use.

Machine translation — show Japanese original

ICカード「PASMO」の利用が可能となる。

2013 8月26日

As part of the Tozai Line Solar Power Plant plan, a solar power generation system was introduced at the station.

Machine translation — show Japanese original

「東西線ソーラー発電所」計画の一環で当駅に太陽光発電システムが導入される。

2015 6月6日

Departure melodies were introduced.

Machine translation — show Japanese original

発車メロディを導入。

2022 4月16日

Platform doors began operating.

Machine translation — show Japanese original

ホームドア供用開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
A Day in the METRO
1番線
Beyond the Metropolis
1番線
By line
Tōzai Line
A-line
A Day in the Metro
B-line
Beyond the Metropolis
Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TŌZAI LINE)
1
西船橋 · 津田沼 · 東葉勝田台
2
中野 · 三鷹
Platforms 1, 2 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Nishi-Kasai Station FAQ

What train lines connect at Nishi-Kasai Station?

Nishi-Kasai Station is served by Tōzai Line.