Roka-koen
Roka-koen Station
Live Network Status Active
Roka koen is a railway station in Tokyo.
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
12 Events
1913
4月15日
It opened as Kamitakaido Station on the Keio Electric Railway, now Keio Corporation.
Machine translation — show Japanese original
京王電気軌道(現・京王電鉄)の上高井戸駅(かみたかいどえき)として開設。
1937
9月1日
The station was renamed Rokakōen Station.
Machine translation — show Japanese original
芦花公園駅(ろかこうえんえき)に改称。
1944
5月31日
Tokyo Kyuko Electric Railway (Dai-Tokei, now Tokyu Corporation) merged with Keio Electric Railway, and the station became part of the Keio Line.
Machine translation — show Japanese original
東京急行電鉄(大東急、現・東急電鉄)が京王電気軌道を吸収合併、同社京王線の駅となる。
1948
6月1日
The station was separated from Tokyu and became a station of Keio Teito Electric Railway.
Machine translation — show Japanese original
東急から京王帝都電鉄が分離、同社の駅となる。
1965
12月
The platform was relocated, extended by 115m, and a new south entrance station building was established.
Machine translation — show Japanese original
ホームを移設、115mに延伸し、南口駅舎を新設する。
1982
3月
The station building was moved underground.
Machine translation — show Japanese original
地下駅舎化。
2010
9月
The station was elevated.
Machine translation — show Japanese original
橋上駅舎化。
2014
2月28日
The continuous grade separation project was undertaken.
Machine translation — show Japanese original
連続立体交差事業着手。
2024
1月31日
The escalator connecting the north-side road and the ticket gate was closed due to progress in the continuous elevated crossing project.
Machine translation — show Japanese original
連続立体交差事業進捗に伴い、北側公道と改札口を連絡するエスカレーターを閉鎖。
2024
8月30日
With the progress of the continuous grade separation project, temporary ticket gates at the up-platform were put into use.
Machine translation — show Japanese original
連続立体交差事業進捗に伴い、上りホーム臨時改札使用開始。
2024
10月26日
The stairs connecting the north-side road and the ticket gate were closed due to the progress of the continuous grade separation project.
Machine translation — show Japanese original
連続立体交差事業進捗に伴い、北側公道と改札口を連絡する階段を閉鎖。
2026
Provisional underground passage construction is planned.
Machine translation — show Japanese original
仮地下通路整備予定。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (KEIO LINE)
Platform assignment not documented for this line yet
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Roka-koen Station FAQ
What train lines connect at Roka-koen Station?
Roka-koen Station is served by Keio Line.