相模大塚駅
Sagami-Ōtsuka Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
5 Events
1926
5月12日
The station opened in the vicinity of the current Sagamino Station as a station on the former Jinchū Railway.
Machine translation — show Japanese original
旧・神中鉄道の駅として現在のさがみ野駅付近に開業。
1943
At this time, the location was moved to a position 50 meters towards Ebina from the current location.
Machine translation — show Japanese original
頃:現在地より50メートル海老名方の位置に移転。
1975
8月17日
The station was relocated to its current location and became an elevated station.
Machine translation — show Japanese original
現在地に移転して橋上駅舎化。
1998
12月16日
A 3000 series (2nd generation) train on a non-revenue move was involved in a points accident on a storage track and was subsequently deemed beyond repair and scrapped in 1999.
Machine translation — show Japanese original
回送列車の3000系 (2代)が留置線でポイント事故を起こす(修復不可能と判断されたため、翌1999年に廃車)。
2022
1月16日
Platform doors began to be used.
Machine translation — show Japanese original
ホームドアの使用を開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Sagami-Ōtsuka Station FAQ
What train lines connect at Sagami-Ōtsuka Station?
Sagami-Ōtsuka Station is served by .