鮫洲駅
Samezu Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
10 Events
1904
5月8日
The line opened.
Machine translation — show Japanese original
開業。
1944
5月1日
It was relocated approximately 160m towards Yokohama.
Machine translation — show Japanese original
横浜寄りに約160m移転。
1966
6月16日
The passing loop facility and overpass began operation, with a platform of the so-called Shinkansen type corresponding to 4-car trains.
Machine translation — show Japanese original
待避設備および跨線橋の使用開始。4両編成対応でいわゆる新幹線型のホームであった。
1977
12月
The effective length of the platform was extended to accommodate 6-car trains.
Machine translation — show Japanese original
ホーム有効長を6両編成分に延伸。
1981
6月
The overpass was abolished and became a temporary underground passage.
Machine translation — show Japanese original
跨線橋が廃止され、仮設の地下道となる。
1989
6月25日
In 1989, the up line was elevated.
Machine translation — show Japanese original
(平成元年) - 上り線が高架化。
1990
12月2日
The down line was elevated.
Machine translation — show Japanese original
下り線が高架化。
1991
12月21日
The elevated station building began operation.
Machine translation — show Japanese original
高架駅舎使用開始。
2011
11月6日
The Keikyu goods shop "Otodokeikyu" opened at Samezu.
Machine translation — show Japanese original
京急グッズショップ「おとどけいきゅう」鮫洲店がオープン。
2020
3月14日
The auxiliary station name Samezu Driving Test Course was added.
Machine translation — show Japanese original
副駅名に鮫洲運転免許試験場が追加される。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Samezu Station FAQ
What train lines connect at Samezu Station?
Samezu Station is served by .