新田
Shinden Station
Live Network Status Active
Shinden is a railway station in Tokyo.
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
9 Events
1899
12月20日
It was established in Nitta Village, Kitaadachi District, Saitama Prefecture, which is the origin of the station's name.
Machine translation — show Japanese original
埼玉県北足立郡新田村に開設。駅名の由来となる。
1908
12月2日
Abolished.
Machine translation — show Japanese original
廃止。
1925
11月10日
Operations resumed.
Machine translation — show Japanese original
営業再開。
1985
12月
The elevation of the up line was completed as far as the Ayase River located north of the station.
Machine translation — show Japanese original
上り線高架化完了(本駅北に位置する綾瀬川まで)。
1988
12月
The down line was fully elevated (same as above).
Machine translation — show Japanese original
下り線高架化完了(同上)。
1994
12月27日
Two escalators began operation.
Machine translation — show Japanese original
エスカレーター2基使用開始。
1995
12月28日
One elevator was put into service.
Machine translation — show Japanese original
エレベーター1基使用開始。
2012
3月17日
Station numbers were set for TS 18.
Machine translation — show Japanese original
TS 18の駅番号が設定。
2023
12月18日
Platform doors began to be used.
Machine translation — show Japanese original
ホームドアの使用を開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TS TOBU SKYTREE LINE)
1
Up
草加 · 北千住 · とうきょうスカイツリー
2
Down
新越谷 · 北越谷 · 北春日部
↕ Platforms 1, 2 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Shinden Station FAQ
What train lines connect at Shinden Station?
Shinden Station is served by TS Tobu Skytree Line.