新杉田

Shin-Sugita Station

日本語で読む

Shin Sugita is a railway station in Tokyo.

Shin-Sugita Station (新杉田駅) is an elevated station in Isogo ward, Yokohama. East Japan Railway Company and Yokohama Seaside Line run it. It is on the Negishi Line. It opened on 17 March 1970.

History

Shin-Sugita Station (新杉田駅) opened on 17 March 1970 with the national railways' Negishi Line between Isogo and Yōkōdai. On 1 April 1987 it became part of East Japan Railway Company (JR East). Automatic ticket gates were installed on the JR side on 4 February 1994.

On 16 August 1978 the east bus terminal began use. In September 1988 a company-run hamburger shop, Taste East Hamburger (テースト・イースト・ハンバーガー), opened. The station building, Alcard Shin-Sugita (アルカード新杉田), opened in part on 20 July 1989 and in full on 15 September 1989. It was renewed in 1998 and again in July 2007.

On 5 July 1989 Yokohama New Urban Transit, now Yokohama Seaside Line, opened its Kanazawa Seaside Line to Kanazawa-Hakkei. In 2000 a lift was added to the JR platform, and the platform shelter was extended toward Isogo. The Suica IC card became usable on 18 November 2001. Escalator work on the JR platform began on 12 December 2006, and the escalators opened on 12 June 2007.

On the night of 1 June 2019 a reverse-running accident happened on the Kanazawa Seaside Line at this station. On 11 July 2025 JR East started smart platform doors here.

See all 17 dated events in the Data view →

Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
17 Events
1970 3月17日

The station opened simultaneously with the opening of the Japanese National Railways Keihin Line between Isoko Station and Yōkōdai Station.

Machine translation — show Japanese original

国鉄根岸線・磯子駅 - 洋光台駅間の開通と同時に開業。

1978 8月16日

Shin-Sugita Station East Bus Terminal began operation.

Machine translation — show Japanese original

新杉田駅東バスターミナル使用開始

1987 4月1日

With the privatization of JNR, it became a JR East station.

Machine translation — show Japanese original

国鉄分割民営化により、JR東日本の駅となる。

1988 9月

The directly managed hamburger restaurant Taste East Burger opened.

Machine translation — show Japanese original

直営のハンバーガー店「テースト・イースト・ハンバーガー」開店。

1989

1990

Machine translation — show Japanese original

(平成元年)

1989 7月5日

Yokohama New Transit (now Yokohama Seaside Line) opened the Kanazawa Seaside Line to Kanazawa-Hakkei Station.

Machine translation — show Japanese original

横浜新都市交通(現・横浜シーサイドライン)金沢シーサイドラインが金沢八景駅まで開通。

1989 7月20日

The station building "Alcard Shin-Sugita" partially opened.

Machine translation — show Japanese original

駅ビル「アルカード新杉田」部分開業。

1989 9月15日

The station building fully opened.

Machine translation — show Japanese original

駅ビル全面開業。

1994 2月4日

Automatic ticket gates were installed at JR East stations.

Machine translation — show Japanese original

JR東日本の駅に自動改札機を設置。

1998

The station building was renovated.

Machine translation — show Japanese original

駅ビルリニューアル。

2000

An elevator was installed on the JR platform and a canopy was added on the Isogo side of the platform.

Machine translation — show Japanese original

JRホームにエレベーター設置。ホーム磯子寄りに上屋増設。

2001 11月18日

JR East introduced the IC card "Suica".

Machine translation — show Japanese original

JR東日本でICカード「Suica」供用開始。

2006 12月12日

Construction to install escalators on the JR platform began.

Machine translation — show Japanese original

JRホームでエスカレータ設置工事を開始。

2007 6月12日

Escalator use began on the JR platform.

Machine translation — show Japanese original

JRホームでエスカレータ使用開始。

2007 7月

The second station building renovation.

Machine translation — show Japanese original

2回目の駅ビルリニューアル。

2019 6月1日

In 2019, the Kanazawa Seaside Line Shin-Sugita Station wrong-way driving accident occurred at night.

Machine translation — show Japanese original

(令和元年)夜:金沢シーサイドライン新杉田駅逆走事故が発生。

2025 7月11日

JR East began using smart home doors.

Machine translation — show Japanese original

JR東日本でスマートホームドアの使用を開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Nearby landmarks not documented yet
Accessibility
Step-free access and facilities not documented yet

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (NEGISHI LINE)
1 Down
洋光台 · 大船
2 Up
横浜 · 東京 · 上野
↕ Platforms 1, 2 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Shin-Sugita Station FAQ

What train lines connect at Shin-Sugita Station?

Shin-Sugita Station is served by Negishi Line.