Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
7 Events
1916
2月9日
Opened.
Machine translation — show Japanese original
開設。
1971
The station structure was changed from the previous 2-side 2-track relative platform to the current 1-island 2-track platform, with platform extension, and the station building was elevated to a bridge style.
Machine translation — show Japanese original
駅構造をそれまでの相対式ホーム2面2線から現在の島式ホーム1面2線へ変更、ホーム延伸。同時に橋上駅舎化。
1997
The effective length of the platform was extended to accommodate 8 cars.
Machine translation — show Japanese original
ホーム有効長を8両へ延伸。
2014
The initial station structure consisted of two side platforms with two tracks, with the station building located on the side of the up platform.
Machine translation — show Japanese original
当初の駅構造は相対式ホーム2面2線。上りホーム側に駅舎があった。
2021
8月15日
As barrier-free construction and station building construction progressed, the stairs leading to the ticket gate were relocated to the middle of the platform, and the existing stairs were abolished.
Machine translation — show Japanese original
バリアフリー化工事および駅舎新設工事進捗に伴い、改札へ続く階段をホーム中程へ移設。従来の階段は廃止となった。
2021
11月30日
The ticket gates were relocated to the newly constructed section due to the progress of barrier-free construction and station building construction work, and the passageway near the old ticket gates is expected to remain in place.
Machine translation — show Japanese original
バリアフリー化工事および駅舎新設工事進捗に伴い、改札口が新設部へと移動した。なお、旧改札口付近の通路は今後も残る予定。
2022
3月31日
With the progress of barrier-free construction and station building construction, elevators between the platform and concourse, as well as the rotundas at the south and north exits, began operating, and since the toilets and multipurpose toilets had already started operating earlier, the barrier-free construction at the station was completed.
Machine translation — show Japanese original
バリアフリー化工事および駅舎新設工事進捗に伴い、ホーム - コンコース間エレベーター、並びに南口、北口、それぞれのロータリーが使用開始。なお、トイレ・多目的トイレはそれより前に使用開始している。これに伴い、当駅バリアフリー化工事が完了した。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (KEISEI MAIN LINE (KS))
1
Up
京成高砂 · 青砥 · 日暮里
2
Down
京成船橋 · 京成津田沼 · 成田空港
↕ Platforms 1, 2 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Sugano Station FAQ
What train lines connect at Sugano Station?
Sugano Station is served by Keisei Main Line (KS).