多田駅 (栃木県)

Tada Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
5 Events
1952 6月8日

It was relocated to its current location.

Machine translation — show Japanese original

現在地に移転。

1966 12月15日

The platform was extended to a length of three cars.

Machine translation — show Japanese original

3両分にホーム延伸。

1968 11月28日

The newly constructed up-platform was opened for use.

Machine translation — show Japanese original

新設した上りホームを使用開始。

1969 10月5日

The station was improved in conjunction with double-tracking.

Machine translation — show Japanese original

複線化に伴い駅改良。

2010 12月21日

Barrier-free construction work at the station was completed.

Machine translation — show Japanese original

駅のバリアフリー化工事が竣工。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Tada Station FAQ

What train lines connect at Tada Station?

Tada Station is served by .