多田駅 (栃木県)
Tada Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
5 Events
1952
6月8日
It was relocated to its current location.
Machine translation — show Japanese original
現在地に移転。
1966
12月15日
The platform was extended to a length of three cars.
Machine translation — show Japanese original
3両分にホーム延伸。
1968
11月28日
The newly constructed up-platform was opened for use.
Machine translation — show Japanese original
新設した上りホームを使用開始。
1969
10月5日
The station was improved in conjunction with double-tracking.
Machine translation — show Japanese original
複線化に伴い駅改良。
2010
12月21日
Barrier-free construction work at the station was completed.
Machine translation — show Japanese original
駅のバリアフリー化工事が竣工。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Tada Station FAQ
What train lines connect at Tada Station?
Tada Station is served by .