田無駅
Tanashi Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
10 Events
1927
4月16日
The line opened.
Machine translation — show Japanese original
開業。
1945
4月12日
The surrounding area of the station suffered significant damage from a US B-29 bomber air raid.
Machine translation — show Japanese original
アメリカ合衆国軍B29爆撃機による空襲により、当駅周辺を中心に大きな被害を受ける。
1961
Track improvement work changed the island platform with 2 tracks to 2 island platforms with 3 tracks.
Machine translation — show Japanese original
構内改良工事により、島式ホーム1面2線を島式ホーム2面3線に変更。
1962
10月12日
The station was elevated.
Machine translation — show Japanese original
橋上駅舎化。
1986
3月23日
A train collision accident occurred due to heavy snow, and train operations were suspended until that night.
Machine translation — show Japanese original
大雪により列車追突事故が発生。当日夜まで列車の運転を見合わせた。
1990
The siding on the north side of the up line, which was used to store freight trains, working cars, and deadheading trains, was removed and the expansion work on Platform 1 was completed.
Machine translation — show Japanese original
上り線北側にあった貨物列車・作業用車・回送などを留置する側線を撤去し、1番ホーム拡張工事が完了。
1995
3月10日
With the opening of the redevelopment building, now known as Asta Building, which housed the Tanashi Seibu store, a part of the wall on the 2nd floor north exit side of the old Tanashi-bashi Station building was removed, and the pedestrian deck connecting the station building and the redevelopment building began full-scale use.
Machine translation — show Japanese original
再開発ビル(田無西武店・現 アスタビル)オープンに伴い、旧田無橋上駅舎2階北口側の一部の壁を削り、駅舎と再開発ビルを結ぶペデストリアンデッキの本格的な使用を開始。
1996
3月
The north entrance station square of Tanashi Station was completed, marking the completion of the Tanashi Station north entrance urban redevelopment project.
Machine translation — show Japanese original
北口駅前広場完成。これをもって田無駅北口市街地再開発事業が完了。
1996
3月31日
Seibu Tanashi Station Building ended operations due to the reconstruction of the north exit elevated station.
Machine translation — show Japanese original
西武田無ステーションビル、北口橋上駅舎改築に伴い営業終了。
1996
4月1日
Construction to rebuild the station building began, with the temporary north exit station building starting operation.
Machine translation — show Japanese original
駅舎建て替え工事を開始。北口仮駅舎での使用開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Tanashi Station FAQ
What train lines connect at Tanashi Station?
Tanashi Station is served by .