Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
15 Events
1897
5月1日
It opened as a station on the Sōbu Railway.
Machine translation — show Japanese original
総武鉄道の駅として開業。
1907
9月1日
The Sōbu Railway was acquired and became a station of the Imperial Railway Agency.
Machine translation — show Japanese original
総武鉄道が買収され、帝国鉄道庁の駅となる。
1914
5月18日
The Chiba Prefectural Railway, later known as Narita Railway, Nanao Line opened.
Machine translation — show Japanese original
千葉県営鉄道(後に成田鉄道)八街線開業。
1926
In 1926, the second-generation station building was completed and opened for service.
Machine translation — show Japanese original
(昭和元年):2代目駅舎竣工、供用開始。
1940
5月14日
The Yachiyo Line was abolished.
Machine translation — show Japanese original
八街線廃止。
1974
10月26日
The section between Sakura Station and Chōshi Station was electrified.
Machine translation — show Japanese original
佐倉駅 - 銚子駅間電化。
1982
11月15日
Freight handling was abolished.
Machine translation — show Japanese original
貨物扱い廃止。
1987
4月1日
With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).
Machine translation — show Japanese original
国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。
1991
3月16日
The Sobu Line rapid service began operating, and was extended to Narutō Station in December 1999.
Machine translation — show Japanese original
総武線快速電車乗り入れ開始。1999年12月に成東駅まで延伸。
1996
3月16日
Automatic ticket gates were installed.
Machine translation — show Japanese original
自動改札機設置。
2001
11月18日
The IC card "Suica" becomes available for use.
Machine translation — show Japanese original
ICカード「Suica」の利用が可能となる。
2004
4月1日
The third station building was completed and opened, with partial use of the free passage and the opening of the north exit.
Machine translation — show Japanese original
3代目の橋上駅舎完成、供用開始。自由通路一部供用開始、および北口開設。
2005
3月
The free passage was fully opened to the public.
Machine translation — show Japanese original
自由通路完全供用開始。
2017
9月1日
Operations were outsourced.
Machine translation — show Japanese original
業務委託化。
2022
7月31日
The Midori no Madoguchi service ended operations.
Machine translation — show Japanese original
みどりの窓口の営業を終了。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (SŌBU MAIN LINE)
1
Up
佐倉 · 千葉
2・3
Down
成東 · 銚子
↕ Platforms 1, 2, 3 serve this line
Transfers from this platform
→
Sōbu Line (Rapid)
Transit
5 min
Moderate
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Yachimata Station FAQ
What train lines connect at Yachimata Station?
Yachimata Station is served by Sōbu Main Line.