谷峨駅

Yaga Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
13 Events
1907 3月15日

The station opened as Tanioka Signal Box on the government railway between Yamakita and Oyama.

Machine translation — show Japanese original

官設鉄道の谷峨信号所として、山北 - 小山間に開業。

1909 10月12日

The line name was designated and the route passing through the signal station was named the Tōkaidō Main Line.

Machine translation — show Japanese original

線路名称制定、信号所を通る路線を東海道本線と命名。

1922 4月1日

It was renamed Tanioka Signal Field.

Machine translation — show Japanese original

谷峨信号場に改称。

1934 12月1日

With the opening of the Atami - Numazu section, the Japanese National Railways Tokaido Main Line section from Kōzu to Tannowa to Numazu was renamed the Odawara Line is incorrect and the correct translation is: With the opening of the Atami - Numazu section, the Tokaido Main Line section from Kōzu to Tannowa to Numazu was renamed the Gotemba Line.

Machine translation — show Japanese original

熱海 - 沼津間開通に伴い、東海道本線国府津 - 谷峨 - 沼津間は御殿場線に改称。

1943 7月11日

The Gotemba Line was single-tracked, although the area had been double-tracked in 1901, before the signal station was opened.

Machine translation — show Japanese original

御殿場線単線化。信号所開設前の1901年(明治34年)に付近は複線化されていた。

1947 7月15日

The station was relocated 0.3 km towards Yamakita Station and was elevated to Tannowa Station, starting passenger operations.

Machine translation — show Japanese original

山北駅方面に0.3km移転し谷峨駅に昇格、旅客営業を開始。

1968 4月27日

The yard was electrified in conjunction with the electrification of the Gotemba Line between Odawara and Gotemba.

Machine translation — show Japanese original

御殿場線国府津 - 御殿場間電化に伴い、構内を電化。

1971 2月1日

Freight handling was abolished.

Machine translation — show Japanese original

荷物の取扱いを廃止。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of Tokai Railway Company (JR Central).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東海旅客鉄道(JR東海)の駅となる。

1990 3月

It becomes an unmanned station.

Machine translation — show Japanese original

無人駅となる。

1991 3月16日

The limited express conversion of the "Asagiri" express train resulted in the elimination of all priority train stops.

Machine translation — show Japanese original

急行「あさぎり」特急化により、優等列車の停車が消滅。

2000 3月6日

The station building was rebuilt.

Machine translation — show Japanese original

駅舎を改築。

2019 3月2日

The use of the IC card "TOICA" becomes available.

Machine translation — show Japanese original

ICカード「TOICA」の利用が可能となる。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Yaga Station FAQ

What train lines connect at Yaga Station?

Yaga Station is served by .