Ashiya Station
Riding today
Live departures from this stationAbout this station
History, melodies, surroundingsA new section of the Japanese National Railways Tokaido Main Line between Nishinomiya Station (now Nishiomiya Station was not correct, the correct is the current West Nishinomiya is actually Nishinomiya, the current Nishiomiya is actually Hanshin Nishinomiya, but the original Nishinomiya is the current Nishinomiya) and Sumiyoshi Station opened, starting passenger and freight operations, constructed with a donation of 10,000 yen for construction costs and a petition from the then Seido Village, with around 80 passengers per day.
Machine translation — show Japanese original
国有鉄道東海道本線の西ノ宮駅(現在の西宮駅) - 住吉駅間に新設開業。旅客・貨物の取り扱いを開始。当時の精道村の請願、工事費1万円の寄付により建設。当時の1日の乗降客数は約80人。
The Great Hanshin Flood occurred, causing damage including the bursting of the Ashiya River levee and flooding of the station premises.
Machine translation — show Japanese original
阪神大水害が発生。芦屋川の堤防が決壊して駅構内が冠水する被害。
Freight handling was abolished.
Machine translation — show Japanese original
貨物の取り扱いを廃止。
The station building was elevated over the tracks.
Machine translation — show Japanese original
駅舎橋上化。
The station building, Montreuil, opened with Daimaru and Sanwa Bank (now Mitsubishi UFJ Bank) as main tenants.
Machine translation — show Japanese original
駅ビルとしてモンテメールが開業(主要テナントは大丸と三和銀行(現・三菱UFJ銀行)
Freight handling was abolished.
Machine translation — show Japanese original
荷物扱い廃止。
With the privatization of Japanese National Railways, it became a station of West Japan Railway Company (JR West).
Machine translation — show Japanese original
国鉄分割民営化により西日本旅客鉄道(JR西日本)の駅となる。
The line nickname was established, and the nickname "JR Kobe Line" started being used.
Machine translation — show Japanese original
路線愛称の制定により、「JR神戸線」の愛称を使用開始。
New limited express trains begin stopping during the daytime hours, with some also stopping at Takatsuki Station.
Machine translation — show Japanese original
日中時間帯に新快速が停車するようになる(同時に高槻駅にも一部が停車)。
On holidays, the new limited express trains also stop at the station in the morning, but continue to pass through in the evening.
Machine translation — show Japanese original
休日の新快速が朝にも停車するようになる。ただし、夕方以降は通過のまま。
The station was temporarily closed due to the complete destruction of its facilities in the Great Hanshin-Awaji Earthquake.
Machine translation — show Japanese original
阪神・淡路大震災で駅施設が全壊したため一時営業休止。
The section between Kōshien-guchi Station and this station was reopened for business.
Machine translation — show Japanese original
甲子園口駅 - 当駅間が営業再開。
Service was reopened between this station and Sumiyoshi Station.
Machine translation — show Japanese original
当駅 - 住吉駅間が営業再開。
The new rapid service trains stop at all stations on Saturdays and holidays.
Machine translation — show Japanese original
土曜・休日の新快速が全列車停車。
The restoration work on the station facilities that collapsed in the Great Hanshin-Awaji Earthquake was completed, with the installation of elevators and electronic destination signs, and the Osaka-bound platform was relocated to the east side.
Machine translation — show Japanese original
阪神・淡路大震災で崩落した駅施設の復旧工事がすべて完成。エレベーターと電光掲示板タイプの発車標を設置。大阪方面のホームを東側に移動。
The JR Kobe Line introduced the standard arrival melody "Sazanami".
Machine translation — show Japanese original
JR神戸線標準接近メロディ「さざなみ」導入。
Automatic ticket gates were installed and put into service.
Machine translation — show Japanese original
自動改札機を設置し、供用開始。
The west building of the station building "Montemere" opened.
Machine translation — show Japanese original
駅ビル「モンテメール」の西館開業。
The JR Kyoto and Kobe Line introduced an operating management system.
Machine translation — show Japanese original
JR京都・神戸線運行管理システム導入。
The station also began operating with the introduction of IC card "ICOCA".
Machine translation — show Japanese original
ICカード「ICOCA」の利用が可能となることに伴い、当駅でも供用を開始する。
The Shin-Kaisoku service began making stops all day.
Machine translation — show Japanese original
新快速が終日停車するようになる。
The automatic station broadcasts were updated.
Machine translation — show Japanese original
駅自動放送を更新。
The train arrival melody was changed back to a revised version of the standard JR Kobe Line melody "Sazanami" due to a review of the train entry warning sound.
Machine translation — show Japanese original
入線警告音の見直しに伴い、接近メロディをJR神戸線標準接近メロディ「さざなみ」の音質見直し版に再び変更する。
Mutual transfers between the New Limited Express and local trains at this station were abolished.
Machine translation — show Japanese original
当駅での新快速と普通の相互接続が廃止される。
Station numbering was introduced and its use began.
Machine translation — show Japanese original
駅ナンバリングが導入され、使用を開始する。
In 2019, improvement work began on the Ashiya Station premises and the surrounding south side area.
Machine translation — show Japanese original
(令和元年):芦屋駅構内・南側周辺改良工事が開始される。
The station building Montemere has reopened after renovations.
Machine translation — show Japanese original
駅ビルのモンテメールがリニューアルオープン。
The Midori-no-Madoguchi was relocated and renovated.
Machine translation — show Japanese original
みどりの窓口が移転および改修される。
Some ticket gates were relocated and renovated.
Machine translation — show Japanese original
一部改札の移転および改修。
The first phase renovation was completed and the expanded station building started operating, with new escalators installed on the north side of the station and on the down platform for up use, and some shops opened inside the concourse.
Machine translation — show Japanese original
第1期リニューアル工事が完了し、増築部の駅舎の供用が開始される。駅北側にエスカレーター新設。下りホームに上り用エスカレーター新設。コンコース内の一部店舗が開業。
A new down escalator for down trains was installed on the down platform.
Machine translation — show Japanese original
下りホームに下り用エスカレーター新設。
Renovation of the restrooms inside the ticket gates.
Machine translation — show Japanese original
改札内トイレの改修。
An up escalator for up trains was newly installed on the up platform.
Machine translation — show Japanese original
上りホームに上り用エスカレーター新設。
A waiting area was established inside the concourse and some shops inside the concourse opened.
Machine translation — show Japanese original
コンコース内に待合空間を設置。コンコース内の一部店舗開業。
An up escalator for down trains was newly installed on the up platform.
Machine translation — show Japanese original
上りホームに下り用エスカレーター新設。
New escalators were installed on the south side of the station, completing all renovation work.
Machine translation — show Japanese original
駅南側にエスカレーター新設。これにより、リニューアル工事が全て完成。
Renovation work began.
Machine translation — show Japanese original
リニューアル工事開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Getting around
Platforms, transfers and navigationCommunity Photos
Photos shared by riders. Been to this station? Add yours.
Ashiya Station FAQ
What train lines connect at Ashiya Station?
Ashiya Station is served by .