Chikatetsu-Akatsuka Station
Chikatetsu Akatsuka is a railway station in Tokyo.
Riding today
Live departures from this stationAbout this station
History, melodies, surroundingsWork began on the civil engineering for the No. 8 Line's "Narimasu 1st section - Akabane 2nd section" (present-day Subway Narimasu Station - near this station) including this station, which was provisionally named Akabane in the planning stage.
Machine translation — show Japanese original
当駅を含む第8号線「成増一工区 - 赤塚二工区」(現・地下鉄成増駅 - 当駅付近)間の土木工事に着手。計画段階での仮称は「赤塚」。
This is because the section passing under the Kawagoe Highway (National Route 254) had almost no land acquisition issues, allowing construction to proceed smoothly, but the completion and opening of the adjacent sections were significantly delayed.
Machine translation — show Japanese original
これは、川越街道(国道254号)の地下を通る同区間は用地買収がほとんどなく、順調に工事が進められたためである。しかし、前後の区間の完成・開業が大幅に遅れたため、8年間にわたって施設は未供用の状態となっていた。
The civil engineering work was completed on Section 8 "Narimasu 1st district - Akabane 2nd district".
Machine translation — show Japanese original
第8号線「成増一工区 - 赤塚二工区」間の土木工事完成。
The station name was given the prefix "Eidan", an abbreviation of Teito Kōsoku Tetsudō Eidan, to distinguish it from Tōbu Railway's Shimo-Akatsuka Station.
Machine translation — show Japanese original
東武鉄道下赤塚駅と区別するため、帝都高速度交通営団の略称「営団」を冠した駅名となった。
The station opened as Eidan-Akatsuka Station with the opening of the Teito Kōsoku Denki Tetsudō (Eidan Subway) Yūrakuchō Line between Eidan-Narimasu (now Subway Narimasu) and Ikebukuro.
Machine translation — show Japanese original
帝都高速度交通営団(営団地下鉄)有楽町線の営団成増(現・地下鉄成増) - 池袋間の開通により、営団赤塚駅(えいだんあかつかえき)として開業。
It becomes an entrusted station operation.
Machine translation — show Japanese original
業務委託駅となる。
With the privatization of Teito Rapid Transit Authority, the station was inherited by Tokyo Metro and the station name was changed to Chikatetsu Akatsuka Station.
Machine translation — show Japanese original
営団地下鉄の民営化に伴い、当駅は東京地下鉄(東京メトロ)に継承される。駅名を「地下鉄赤塚駅」に改称。
The IC card "PASMO" becomes available for use.
Machine translation — show Japanese original
ICカード「PASMO」の利用が可能となる。
With the opening of the Fukutoshin Line, the station became a shared station for the Yurakucho Line and the Fukutoshin Line.
Machine translation — show Japanese original
副都心線開業により、当駅は有楽町線と副都心線の共用駅となる。
Platform doors began to be used.
Machine translation — show Japanese original
ホームドアの使用を開始。
Departure melodies were introduced.
Machine translation — show Japanese original
発車メロディを導入。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Let's Train
Hajimaru yo
Let's Train
Hajimaru yo
Getting around
Platforms, transfers and navigationCommunity Photos
Photos shared by riders. Been to this station? Add yours.
Chikatetsu-Akatsuka Station FAQ
What train lines connect at Chikatetsu-Akatsuka Station?
Chikatetsu-Akatsuka Station is served by Fukutoshin Line, Yūrakuchō Line.