東北沢

Higashi-Kitazawa Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
13 Events
1927 4月1日

The station opened and began handling passengers and freight.

Machine translation — show Japanese original

開設。旅客・貨物取扱開始。

1966

Freight handling was abolished.

Machine translation — show Japanese original

貨物取扱廃止。

1978 3月31日

The section between Yoyogi-Uehara Station and the current station was quadrupled.

Machine translation — show Japanese original

代々木上原駅 - 当駅間複々線化。

2004 9月

Work began on the undergrounding and quadruple-tracking project.

Machine translation — show Japanese original

地下化・複々線化工事着手。

2005 10月1日

Tracks 2 and 3 (the express lines) were closed due to underground construction and quadruple-tracking work.

Machine translation — show Japanese original

地下化・複々線化工事のため、2・3番線(急行線)使用停止。

2006 11月25日

The provisional bridge-style station building began to be used, and at the same time, the up line was switched to the provisional platform.

Machine translation — show Japanese original

仮設橋上駅舎使用開始。同時に上り線が仮設ホームへ切替。

2009 4月25日

The down line was switched to a temporary platform.

Machine translation — show Japanese original

下り線が仮設ホームへ切替。

2013 3月23日

The section between this station and Setagaya-Daita Station was undergrounded, and temporary underground platforms began to be used at the same time.

Machine translation — show Japanese original

当駅 - 世田谷代田駅間地下化。同時に仮設地下ホーム使用開始。

2014 1月

Station numbering was introduced and began to be used.

Machine translation — show Japanese original

駅ナンバリングが導入され、使用を開始。

2015 5月16日

The above-ground station building began operation.

Machine translation — show Japanese original

地上駅舎使用開始。

2016 11月26日

The above-ground station building was completed.

Machine translation — show Japanese original

地上駅舎完成。

2018 3月3日

The quadrupling of the line was completed, and express line and local line operations using the newly established home platforms began.

Machine translation — show Japanese original

複々線化完成。急行線(通過線)と緩行線本設ホーム運用開始。

2018 3月17日

With the timetable revision accompanying quadrupling, through trains on the Tokyo Metro Chiyoda Line began stopping.

Machine translation — show Japanese original

複々線化に伴うダイヤ改正に伴い、東京メトロ千代田線直通列車停車開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Higashi-Kitazawa Station FAQ

What train lines connect at Higashi-Kitazawa Station?

Higashi-Kitazawa Station is served by Odakyu Odawara Line (OH).