本厚木

Hon-Atsugi Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
33 Events
1927 4月1日

The station opened as Sagamiatsugi Station and became a stop for "direct" trains, while local trains only operated between Shinjuku Station and Inadazutto Station (now Yukōen Station), with no service to this station.

Machine translation — show Japanese original

相模厚木駅(さがみあつぎえき)として開設。「直通」の停車駅となる。各停は新宿駅 - 稲田登戸駅(現・向ヶ丘遊園駅)間運行であり、当駅までの運行はなかった。

1927 10月15日

Express service was introduced, and it became a stop on the line.

Machine translation — show Japanese original

急行新設、停車駅となる。

1941 11月25日

The Jin Tsu Railway, now Sagami Railway, began operating trains between Ebina Station and this station.

Machine translation — show Japanese original

神中鉄道(現・相模鉄道)列車が海老名駅 - 当駅間で乗入開始。

1944 6月1日

The station was renamed Hon-Atsugi Station.

Machine translation — show Japanese original

本厚木駅(ほんあつぎえき)へ改称。

1944 11月

Express services were suspended due to the worsening war situation in the Pacific War.

Machine translation — show Japanese original

太平洋戦争戦況悪化に伴い、急行運行中止。

1945 6月

The local trains running between Shinjuku Station and Inada-Noborito Station (now Yukuechouen Station) were extended to run on the entire line, and the station became a stop, while the "Direct" service was abolished.

Machine translation — show Japanese original

従来、新宿駅 - 稲田登戸駅(現・向ヶ丘遊園駅)間運行の各停が全線運行されることとなり、停車駅となる。同時に「直通」廃止。

1946 10月1日

Semi-express service was introduced, and it became a stop on the line.

Machine translation — show Japanese original

準急新設、停車駅となる。

1949 10月1日

Express service is restored, and it becomes a stop.

Machine translation — show Japanese original

急行復活、停車駅となる。

1955 3月25日

The Commuter Rapid Service was introduced and it became a stop on the line.

Machine translation — show Japanese original

通勤急行新設、停車駅となる。

1960 3月25日

Commuter semi-express service is introduced, and it becomes a stop.

Machine translation — show Japanese original

通勤準急新設、停車駅となる。

1964 11月5日

Through services from Sotetsu ceased.

Machine translation — show Japanese original

相鉄からの乗入消滅。

1968 7月10日

The Romancecar "Sagami" began making stops.

Machine translation — show Japanese original

ロマンスカー「さがみ」停車開始。

1974 12月

The down line was elevated.

Machine translation — show Japanese original

下り線高架化。

1976 1月30日

The up line was elevated.

Machine translation — show Japanese original

上り線高架化。

1977 3月29日

The continuous grade separation around the station was completed.

Machine translation — show Japanese original

駅周辺連続立体交差化竣工。

1978 3月31日

Teito Rapid Transit Authority (Eidan), the predecessor to Tokyo Metro, began mutual direct operation with the Chiyoda Line.

Machine translation — show Japanese original

帝都高速度交通営団(現・東京地下鉄)千代田線と相互直通運転開始。

1982 3月23日

The station building "Mirodo" opened.

Machine translation — show Japanese original

駅ビル「ミロード」開店。

1982 11月21日

Odakyu installed its first two automatic ticket vending machines.

Machine translation — show Japanese original

小田急初の自動精算機2台新設。

1984 2月1日

The Romancecar "Asagiri" began making stops.

Machine translation — show Japanese original

ロマンスカー「あさぎり」停車開始。

1987 4月1日

With the privatization of Japanese National Railways, the "Asagiri" began operating under the control of East Japan Central Railway, now known as East Japan Railway, but here it is Central Japan Railway (JR Central).

Machine translation — show Japanese original

国鉄分割民営化に伴い、「あさぎり」の乗入先が東海旅客鉄道(JR東海)となる。

1992 9月

A wheelchair-accessible escalator was newly installed inside the central ticket gate.

Machine translation — show Japanese original

中央改札内に車椅子対応エスカレーター新設。

1995 3月4日

The Romancecar "Ashigara" began making stops at some stations.

Machine translation — show Japanese original

ロマンスカー「あしがら」の一部列車停車開始。

1999

The "Sagami" and "Ashigara" services were replaced by the "Support" service, with "Sagami" and "Ashigara" being discontinued and "Support" starting operations, and the down limited express trains departing from Shinjuku Station after 18:00 were renamed to "Homeway" regardless of their route.

Machine translation — show Japanese original

従来の「さがみ」・「あしがら」に代わり「サポート」の名称を採用。「さがみ」・「あしがら」が廃止され、「サポート」が停車開始。また、新宿駅18時以降出発下り特急列車愛称を運行系統関係無く「ホームウェイ」とする。「ホームウェイ」停車開始。

2003 3月23日

A new elevator was installed and began operation inside the east gate ticket gate.

Machine translation — show Japanese original

東口改札内にエレベーター新設、使用開始。

2004 12月11日

The Rapid Express and Sectional Semi-Express services were introduced, with the station becoming a stop, and the Romancecar service was reorganized, with the "Hakone" service starting to stop at the station, and the "Support" service was renamed to "Sagami".

Machine translation — show Japanese original

快速急行・区間準急新設、停車駅となる。ロマンスカー愛称整理に伴い、「はこね」停車開始。合わせて「サポート」は「さがみ」へ名称変更。

2006

The area around the central ticket gate was renovated, with automatic ticket vending machines, regular ticket and express ticket sales, and ticket gates in that order on the mountain side.

Machine translation — show Japanese original

中央改札口付近が改装され、山側より自動券売機、定期券・特急券売場、改札機の順となる。

2006 2月23日

An automated external defibrillator (AED) was newly installed within the station premises.

Machine translation — show Japanese original

駅構内に自動体外式除細動器(AED)新設。

2006 3月

New waiting rooms were installed on the upper and lower platforms.

Machine translation — show Japanese original

上下ホームに待合室新設。

2010 11月3日

The song "YELL" by Ikimonogakari was adopted as the approaching melody for this station and started being used on the same day.

Machine translation — show Japanese original

いきものがかりの楽曲「YELL」が当駅接近メロディに採用され、同日より使用開始。

2012 3月17日

The semi-express service from this station towards Shin-Matsuda Station was abolished, and the "Bay Resort" service originating and terminating at this station was suspended.

Machine translation — show Japanese original

当駅から新松田駅方面の区間準急廃止。また、当駅始発・終着「ベイリゾート」運休。

2014 1月

Station numbering was introduced and began to be used at OH 34.

Machine translation — show Japanese original

OH 34の駅ナンバリング導入、使用開始。

2023 2月18日

The down platform (tracks 1 and 2) began using large opening platform doors compatible with limited express trains, a first for the Odakyu line.

Machine translation — show Japanese original

下りホーム(1・2番線)に小田急線初となる特急車両対応大開口ホームドアが使用開始。

2023 9月30日

The up-platform (tracks 3 and 4) began using wide-opening platform doors compatible with limited express trains.

Machine translation — show Japanese original

上りホーム(3・4番線)に特急車両対応大開口ホームドア使用開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
YELL
Odakyu Odawara Line (OH) 全ホーム共通 since 2010年11月3日

地元出身グループいきものがかりの楽曲をオルゴール調にアレンジ。上下線でアレンジが異なっている。なお、小田急線でJ-POPミュージシャンの楽曲が接近メロディとして採用されるのは本件が初めてである。

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Hon-Atsugi Station FAQ

What train lines connect at Hon-Atsugi Station?

Hon-Atsugi Station is served by Odakyu Odawara Line (OH).