偕楽園駅

Kairakuen Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
12 Events
1925 2月2日

The Ministry of Railways line's Kōen-shita temporary stop opened.

Machine translation — show Japanese original

鉄道省の公園下仮降車場として開業。

1949 6月1日

Japanese National Railways was established.

Machine translation — show Japanese original

日本国有鉄道が発足。

1967 2月1日

It was renamed Karencuen Temporary Exit Station.

Machine translation — show Japanese original

偕楽園仮降車場に改称。

1969 10月1日

It was changed to Kareiken Temporary Stop.

Machine translation — show Japanese original

偕楽園臨時乗降場に変更。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway, and its name was changed to Kirakuen Station (temporary station).

Machine translation — show Japanese original

国鉄分割民営化により、東日本旅客鉄道の駅となる。また、名称を偕楽園駅(臨時駅)に変更。

1993 3月27日

On May 30, a home platform was temporarily installed on the up line for the 10th National Urban Greening Fair (Green Fair '93 Ibaraki), and a Midori-no-Madoguchi was also temporarily operated.

Machine translation — show Japanese original

5月30日:第10回全国都市緑化フェア(グリーンフェア'93いばらき)開催のため、この期間に限り上り線にもホームを設置。また、みどりの窓口を臨時に営業する。

2011 3月12日

Due to the effects of the Tohoku Pacific Ocean earthquake that occurred the previous day, including the suspension of operation on the Joban Line and the closure of Kairakuen, the business was cancelled for that year.

Machine translation — show Japanese original

以降:この前日(3月11日)に発生した東北地方太平洋沖地震(東日本大震災)の影響で常磐線運転見合わせ、偕楽園の休園(水戸の梅まつり中止)などを受け、同年の営業取り止め。

2013 2月20日

Simple Suica ticket gates were installed, enabling the use of IC transit cards such as Suica.

Machine translation — show Japanese original

簡易Suica改札機を設置し、SuicaをはじめとしたIC乗車カードの利用が可能となる。

2016

Barrier-free measures were implemented by installing a slope.

Machine translation — show Japanese original

バリアフリー対策として、スロープを設置。

2016

The height of the platforms and tracks are raised as a countermeasure against flooding from nearby Lake Chiba.

Machine translation — show Japanese original

周辺にある千波湖の冠水対策として、ホームおよび線路の高さを高くする。

2016 2月20日

Renewal construction was carried out in advance as follows, and operation started in the same year.

Machine translation — show Japanese original

以下のとおりリニューアル工事を事前に行い、同年の運用開始。

2023 2月11日

The station had its operating kilometer set and started selling tickets for departures and arrivals, and the hours during which down trains stopped on Saturdays and holidays were extended by one hour, from around 9:10 to around 16:35.

Machine translation — show Japanese original

当駅に営業キロが設定され、当駅発着の乗車券類の販売が開始される。また、これまでは当該期間の土曜・休日の9時10分頃 - 15時30分頃の下り列車が停車していたが、1時間延長され、9時10分ごろ - 16時35分ごろまでとなった。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kairakuen Station FAQ

What train lines connect at Kairakuen Station?

Kairakuen Station is served by .