亀戸

Kameido Station

Live Network Status Active

Kameido is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
23 Events
1907 9月1日

The Sōbu Railway was nationalized through the Railway Nationalization Act.

Machine translation — show Japanese original

総武鉄道が鉄道国有法により買収され、国有化。

1910 3月27日

Tobu Railway discontinued its passenger train services onto the Sobu Main Line.

Machine translation — show Japanese original

東武鉄道から総武本線への旅客列車乗り入れを廃止。

1923 9月1日

It was damaged due to the Great Kantō earthquake.

Machine translation — show Japanese original

関東大震災により、損壊。

1945 3月10日

It was completely burned down due to the Great Tokyo Air Raid.

Machine translation — show Japanese original

東京大空襲により、全焼。

1968 9月30日

The Toei Trolley Bus was abolished.

Machine translation — show Japanese original

都営トロリーバスが廃止。

1987 4月1日

With the privatization of Japanese National Railways, the station became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、国鉄の駅は東日本旅客鉄道(JR東日本)の駅となる。

1999 2月8日

An escalator was installed on the north side of JR East, near the stairs towards Higashi station.

Machine translation — show Japanese original

JR東日本の北口側平井駅寄り階段にエスカレーターを設置

1999 2月25日

A wheelchair-accessible escalator was installed on the north side of JR East's Kinshicho Station, near the station stairs.

Machine translation — show Japanese original

JR東日本の北口側錦糸町駅駅寄り階段に車いす対応エスカレーターを設置。

2001 11月18日

IC card "Suica" becomes available for use on JR East.

Machine translation — show Japanese original

JR東日本でICカード「Suica」の利用が可能となる。

2006 3月24日

The name of the station building was changed from Kamedo El-Nard to Atre Kameido.

Machine translation — show Japanese original

駅ビルの名称を「亀戸エルナード」から「アトレ亀戸」に変更する。

2007 4月1日

The east exit of JR East was outsourced.

Machine translation — show Japanese original

JR東日本の東口が業務委託化。

2010 3月29日

A station on the Sōbu Railway (now the Sōbu Main Line) opened.

Machine translation — show Japanese original

総武鉄道(現・総武本線)の駅が開業。

2010 4月5日

Tobu Railway's station opened.

Machine translation — show Japanese original

東武鉄道の駅が開業。

2011 9月15日

The station building "Atre Kameido" underwent its first-phase renovation.

Machine translation — show Japanese original

駅ビル「アトレ亀戸」が第1期リニューアル。

2011 10月25日

The station building "Atre Kameido" held its grand opening with the completion of its second-phase renovation.

Machine translation — show Japanese original

駅ビル「アトレ亀戸」の第2期リニューアルに伴い、グランドオープン。

2014 9月3日

The underground first floor and first floor of the station building "Atre Kameido" were renovated.

Machine translation — show Japanese original

駅ビル「アトレ亀戸」の地下1階、1階がリニューアル。

2019 5月16日

In 2019, the 5th floor of the station building "Atre Kameido" was renovated.

Machine translation — show Japanese original

(令和元年):駅ビル「アトレ亀戸」の5階がリニューアル。

2020 4月1日

The north exit of JR East was outsourced, and the station became an outsourced station.

Machine translation — show Japanese original

JR東日本の北口が業務委託化。これに伴い、業務委託駅となる。

2020 10月18日

JR East began using smart home doors.

Machine translation — show Japanese original

JR東日本でスマートホームドアの使用を開始。

2020 12月1日

The underground first floor of the station building "Atre Kameido" has undergone a full renewal.

Machine translation — show Japanese original

駅ビル「アトレ亀戸」の地下1階がフルリニューアル。

2021 3月1日

The east exit of JR East was unmanned all day due to the introduction of the station remote control system, now known as the Customer Support Call System.

Machine translation — show Japanese original

JR東日本の東口が駅遠隔操作システム(現・お客さまサポートコールシステム)導入に伴い、終日無人化。

2022 6月30日

The Midori no Madoguchi service ended operations.

Machine translation — show Japanese original

みどりの窓口の営業を終了。

2025 10月1日

JR East started the Eki-net Q-Chike service.

Machine translation — show Japanese original

JR東日本でえきねっとQチケのサービスを開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (CHŪŌ–SŌBU LINE (LOCAL))
1 Down
秋葉原 · 新宿 · 中野
2 Up
新小岩 · 市川 · 船橋
Platforms 1, 2 serve this line

Transfers from this platform

TI Tobu Kameido Line Tobu
5 min Moderate
PLATFORM LAYOUT (TI TOBU KAMEIDO LINE)
1・2
曳舟
Platforms 1, 2 serve this line

Transfers from this platform

Chūō–Sōbu Line (Local) JR-East
5 min Moderate

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kameido Station FAQ

What train lines connect at Kameido Station?

Kameido Station is served by Chūō–Sōbu Line (Local), TI Tobu Kameido Line.