Kariya Station
Riding today
Live departures from this stationAbout this station
History, melodies, surroundingsThe villages of Shimojibaru, Takasu, and Hanjōdo submitted a petition to the Governor of Aichi Prefecture for the construction of a railway station near Shimojibaru Village, Azashita.
Machine translation — show Japanese original
下重原・高須・半城土三村が下重原村字陣屋下付近への停車場設置願を愛知県知事に提出。
The station of Kiryū is established at the current location.
Machine translation — show Japanese original
現在地に刈谷駅が設置される。
The government railway between Ōbu and Hamamatsu opened.
Machine translation — show Japanese original
大府 - 浜松間の官営鉄道が開通。
The government railway began operating steam locomotive services.
Machine translation — show Japanese original
官営鉄道が汽車営業を開始。
A joint army and navy large-scale exercise was conducted near Ushita Village, with Kariya Station serving as the gateway.
Machine translation — show Japanese original
牛田村付近で陸海軍連合大演習が実施され、刈谷駅が玄関口となる。
The line name was established and it became part of the Tokaido Line.
Machine translation — show Japanese original
線路名称制定。東海道線の所属となる。
Freight sidings were increased and the wooden earthwork of the up platform was replaced with stone construction due to rot.
Machine translation — show Japanese original
貨物側線を増設。木造土留の上りホームが腐敗したため石造に変更。
The request for an increase in the number of train stops was rejected.
Machine translation — show Japanese original
駅停車本数増加願が却下される。
The double-tracking work between Ōbu Station and Kariya Station was completed.
Machine translation — show Japanese original
大府駅 - 刈谷駅間の複線化工事が竣工。
The double-tracking work between Kariya Station and Anjō Station was completed.
Machine translation — show Japanese original
刈谷駅 - 安城駅間の複線化工事が竣工。
The Tōkaidō Line was renamed the Tōkaidō Main Line.
Machine translation — show Japanese original
東海道線を東海道本線に改称。
The Mikawa Railway's Karakawa New Station opened.
Machine translation — show Japanese original
三河鉄道の刈谷新駅が開業。
The Mikawa Railway was extended to Chiryū Station.
Machine translation — show Japanese original
三河鉄道が知立駅まで延伸。
Karinishi Station was relocated.
Machine translation — show Japanese original
刈谷新駅を移設。
The Mikawa Railway was electrified and the Kariya Substation was established.
Machine translation — show Japanese original
三河鉄道が電化、刈谷変電所を設置。
Kariyashin Station was relocated and merged with Kariya Station, becoming a shared station with the Ministry of Railways line, and a south entrance was opened.
Machine translation — show Japanese original
刈谷新駅を刈谷駅に移転統合。省線との共同使用駅となり南口を開設。
The Mikawa Railway merged with Nagoya Railway to become the Meitetsu Mikawa Line.
Machine translation — show Japanese original
三河鉄道が名古屋鉄道に合併し名鉄三河線となる。
The Meitetsu Mikawa Line set up the Kariya Operations District.
Machine translation — show Japanese original
名鉄三河線に刈谷乗務区を設置。
The Meitetsu Kariya Factory was established as a freight car specialist factory and took over the freight car operations from the Shinagawa Factory.
Machine translation — show Japanese original
貨車専門工場として名鉄刈谷工場が発足。新川工場の貨車業務を刈谷工場へ移管。
Direct trains to Nagoya started operating on the Mikawa Line.
Machine translation — show Japanese original
三河線に名古屋方面直通列車が運転開始。
The Tōkaidō Main Line began to have limited express trains "Yamato" and "Unzen" make stops.
Machine translation — show Japanese original
東海道本線に急行「大和」「雲仙」が停車するようになる。
The Kariya Station area redevelopment project was approved.
Machine translation — show Japanese original
刈谷駅前区画整理が認可される。
The Kariya Station area redevelopment project commenced.
Machine translation — show Japanese original
刈谷駅前区画整理着工。
A groundbreaking ceremony for the reconstruction of Kariya Station was held.
Machine translation — show Japanese original
刈谷駅改築工事の地鎮祭が開催される。
Construction began on the renovation of Kariya Station.
Machine translation — show Japanese original
刈谷駅改築工事着工。[[ファイル:Kariya Station-NorthPlaza 1954.jpg|thumb|新駅舎と整備中の北口]]
A provisional completion ceremony for the reconstruction of Kariya Station was held, and ticket gates began operating at the new station building.
Machine translation — show Japanese original
刈谷駅改築工事の仮落成式を実施。新駅舎で出改札開始。
The limited express "Genkai" began making stops on the Tokaido Main Line.
Machine translation — show Japanese original
東海道本線に急行「げんかい」が停車するようになる。
The Japanese National Railways bus service between Kariya Station south exit and Anjo Station opened.
Machine translation — show Japanese original
刈谷駅南口 - 安城駅間の国鉄バスが開通。
The completion ceremony for the rebuilding work of Kariya Station was held.
Machine translation — show Japanese original
刈谷駅改築工事の完工式が行われる。
The electrification work on the Tokaido Main Line was completed, and trial operation trains were operated on the Kariya Station - Hamamatsu Station section.
Machine translation — show Japanese original
東海道本線電化工事が終わり、刈谷駅 - 浜松駅間で試運転列車が運転される。
The Tōkaidō Main Line was electrified and commenced commercial operations.
Machine translation — show Japanese original
東海道本線が電化され、営業運転を開始。
The Sakura-machi Overpass Road Construction Opposition Alliance was formed.
Machine translation — show Japanese original
桜町立体交差道路建設反対期成同盟会が結成される。
Kariya City established the Grade Separation Special Committee.
Machine translation — show Japanese original
刈谷市が立体交差特別委員会を設置する。
The urban redevelopment project in front of Kariya Station was completed.
Machine translation — show Japanese original
刈谷駅前区画整理完工。
Miyagi Michio died after falling at Kasugai Station.
Machine translation — show Japanese original
宮城道雄が刈谷駅付近で転落死する。
Groundbreaking occurred for the improvement work within Kariya Station.
Machine translation — show Japanese original
刈谷駅構内改良工事着工。
The improvement work on the Kariya Station premises was completed.
Machine translation — show Japanese original
刈谷駅構内改良工事完工。
The expansion construction of the pedestrian overpass for Japanese National Railways and Meitetsu Kariya Station connection began.
Machine translation — show Japanese original
国鉄・名鉄刈谷駅連絡用陸橋拡幅工事着工。
The expansion work on the pedestrian overpass for Japanese National Railways and Meitetsu Kariya Station connection was completed.
Machine translation — show Japanese original
国鉄・名鉄刈谷駅連絡用陸橋拡幅工事完工。
The Meitetsu Kariya Operations District was relocated to the Chiryu Operations District.
Machine translation — show Japanese original
名鉄刈谷乗務区を知立乗務区に移転。
The Kariya Overpass was completed.
Machine translation — show Japanese original
刈谷跨線橋が完成する。
The Kariya factory was reorganized into the Kariya branch factory and became a branch factory of the Narumi factory.
Machine translation — show Japanese original
(日付不詳):刈谷工場が刈谷分工場に改組され、鳴海工場の分工場となる。
The "Rapid Express" service began operating between Shin-Odaka and Nishi-Kuwana was not mentioned but rather between Shin-Ono and Nishi-Kuwana was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Nishi-Kuwana was not mentioned but rather between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned but rather between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned but rather between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was
Machine translation — show Japanese original
新一宮 - 碧南間の「快速特急」が運行開始される(三河線特急を参照)。
The Mikawa Line's "rapid express" service began operating as express trains within the line.
Machine translation — show Japanese original
三河線の「快速特急」が線内でも特急運転を開始。
Limited express services originating and terminating at Kariya City Station began operation, and the Mikawa Line limited express services became a 4-trains-per-hour system.
Machine translation — show Japanese original
刈谷市駅始発着特急が運行を開始し、三河線特急が毎時4本体制になる。
The Kariya Branch Factory was abolished.
Machine translation — show Japanese original
刈谷分工場が廃止される。
The Meitetsu Mikawa Line Kariya City Elevated Promotion Council was formed.
Machine translation — show Japanese original
名鉄三河線刈谷市街地高架促進協議会が結成される。
A clock tower was installed at the south exit of Kariya Station and an unveiling ceremony was held.
Machine translation — show Japanese original
刈谷駅南口に時計塔が設置され、除幕式が行われる。
The Travel Center opened.
Machine translation — show Japanese original
旅行センター開業。
Most of the limited express services on the Mikawa Line were downgraded to rapid services.
Machine translation — show Japanese original
三河線特急のほとんどが急行に格下げされる。
The elevated structure for the Kariya - Kariya City section was decided by urban planning.
Machine translation — show Japanese original
刈谷 - 刈谷市間の高架化が都市計画決定。
The remaining Mikawa Line limited express trains were downgraded to rapid services, resulting in the complete abolition of limited express services.
Machine translation — show Japanese original
残存した三河線特急が急行に格下げされ特急が全廃。
Work began on the temporary line construction between Kariya and Kariya City Station.
Machine translation — show Japanese original
刈谷 - 刈谷市駅間の仮線工事着手。
In the latter part of the month, elevated line construction work began on the section between Kariya and Kariya-shi Station.
Machine translation — show Japanese original
下旬:刈谷 - 刈谷市駅間の高架化工事着手。
The section between Kariya and Kariyashi Station was elevated and double-tracked.
Machine translation — show Japanese original
刈谷 - 刈谷市駅間が高架複線化される。
The operations at the south exit of Kariya Station were changed to be handled by Meitetsu.
Machine translation — show Japanese original
刈谷駅南口の業務を名鉄担当に変更。
The Mikawa Line express service was abolished.
Machine translation — show Japanese original
三河線急行が廃止される。
The freight operations on the Mikawa Line were abolished.
Machine translation — show Japanese original
三河線の貨物営業が廃止される。
The handling of carload freight on the Tōkaidō Main Line was abolished.
Machine translation — show Japanese original
東海道本線の車扱貨物取扱が廃止される。
The handling of freight and container cargo on the Tokaido Main Line was abolished, and all cargo handling was completely discontinued, with the former freight facilities being repurposed to open the Kariya Container Center.
Machine translation — show Japanese original
東海道本線の荷物・コンテナ貨物の取り扱いが廃止され、貨物の取り扱いが全廃する。貨物関連施設を流用して刈谷コンテナセンターを開設。
With the privatization of Japanese National Railways, the East Japan Railway Company inherited Kariya Station on the Tokaido Main Line, while Japan Freight Railway Company inherited Kariya Container Center.
Machine translation — show Japanese original
国鉄分割民営化により、東海道本線刈谷駅を東海旅客鉄道(JR東海)が継承。刈谷コンテナセンターは日本貨物鉄道(JR貨物)が継承。
The 100th anniversary commemoration of Kariya Station's opening was held.
Machine translation — show Japanese original
刈谷駅開業100周年記念行事が開催される。[[ファイル:KariyaStation-SouthGate.jpg|thumb|180px|完成当初の南北連絡通路]]
In 1989, the north-south passage was completed.
Machine translation — show Japanese original
(平成元年):南北連絡通路が完成する。
The Mikawa Line's Kariya Station was relocated.
Machine translation — show Japanese original
三河線刈谷駅を移設。
JR Central introduced automatic ticket gates.
Machine translation — show Japanese original
JR東海に自動改札機を導入。
The transportation prepaid card "Tranpass" became available for use on Meitetsu, and the Kariya Container Center was relocated and renamed Kariya Offrail Station.
Machine translation — show Japanese original
名鉄で交通プリペイドカード「トランパス」の利用が可能となる。刈谷コンテナセンターが移転して刈谷オフレールステーションに改称。
The use of the IC card "TOICA" becomes available on JR Central.
Machine translation — show Japanese original
JR東海でICカード「TOICA」の利用が可能となる。
Meitetsu completed its barrier-free construction work, which included the installation of elevators, the addition of stairs, and the extension of platforms.
Machine translation — show Japanese original
名鉄のバリアフリー化工事竣工。エレベータ設置、階段増設、ホーム延長など実施。
The pedestrian deck "Minakuru Kariya Wing Deck" at the south exit of the station was completed.
Machine translation — show Japanese original
駅南口のペデストリアンデッキ「みなくる刈谷ウイングデッキ」が完成する。
The construction of new stairs within the Tōkaidō Main Line premises was completed.
Machine translation — show Japanese original
東海道本線構内の階段新設工事完工。
The use of the IC card "manaca" becomes available on Meitetsu.
Machine translation — show Japanese original
名鉄でICカード「manaca」の利用が可能となる。
The use of the Prepaid IC card Transit Pass, or Trampa, came to an end.
Machine translation — show Japanese original
トランパスの使用が終了する。
From the 3rd to the 7th, temporary timetables were in operation due to track switching work accompanying the expansion of the Tokaido Line's down platform.
Machine translation — show Japanese original
3日~7日:東海道線下りホーム拡幅に伴う線路切替工事に伴い臨時ダイヤで運転。
A platform gate is to be installed on the JR Central 4th platform.
Machine translation — show Japanese original
JR東海の4番線ホームで、可動柵を設置(予定)。
The JR Central 3rd platform will be equipped with platform screen doors.
Machine translation — show Japanese original
度:JR東海の3番線ホームで、可動柵を設置(予定)。
Plans call for the installation of platform gates on the JR Central's up platform (tracks 1 and 2).
Machine translation — show Japanese original
度:JR東海の上りホーム(1・2番線)で、可動柵を設置(予定)。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Getting around
Platforms, transfers and navigationCommunity Photos
Photos shared by riders. Been to this station? Add yours.
Kariya Station FAQ
What train lines connect at Kariya Station?
Kariya Station is served by .