Kariya

Kariya Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
76 Events
1887 9月9日

The villages of Shimojibaru, Takasu, and Hanjōdo submitted a petition to the Governor of Aichi Prefecture for the construction of a railway station near Shimojibaru Village, Azashita.

Machine translation — show Japanese original

下重原・高須・半城土三村が下重原村字陣屋下付近への停車場設置願を愛知県知事に提出。

1888 1月

The station of Kiryū is established at the current location.

Machine translation — show Japanese original

現在地に刈谷駅が設置される。

1888 8月

The government railway between Ōbu and Hamamatsu opened.

Machine translation — show Japanese original

大府 - 浜松間の官営鉄道が開通。

1888 9月1日

The government railway began operating steam locomotive services.

Machine translation — show Japanese original

官営鉄道が汽車営業を開始。

1890 4月1日

A joint army and navy large-scale exercise was conducted near Ushita Village, with Kariya Station serving as the gateway.

Machine translation — show Japanese original

牛田村付近で陸海軍連合大演習が実施され、刈谷駅が玄関口となる。

1895 4月1日

The line name was established and it became part of the Tokaido Line.

Machine translation — show Japanese original

線路名称制定。東海道線の所属となる。

1895 11月

Freight sidings were increased and the wooden earthwork of the up platform was replaced with stone construction due to rot.

Machine translation — show Japanese original

貨物側線を増設。木造土留の上りホームが腐敗したため石造に変更。

1896 12月26日

The request for an increase in the number of train stops was rejected.

Machine translation — show Japanese original

駅停車本数増加願が却下される。

1908 1月27日

The double-tracking work between Ōbu Station and Kariya Station was completed.

Machine translation — show Japanese original

大府駅 - 刈谷駅間の複線化工事が竣工。

1908 3月25日

The double-tracking work between Kariya Station and Anjō Station was completed.

Machine translation — show Japanese original

刈谷駅 - 安城駅間の複線化工事が竣工。

1909 10月12日

The Tōkaidō Line was renamed the Tōkaidō Main Line.

Machine translation — show Japanese original

東海道線を東海道本線に改称。

1914 2月5日

The Mikawa Railway's Karakawa New Station opened.

Machine translation — show Japanese original

三河鉄道の刈谷新駅が開業。

1915 10月28日

The Mikawa Railway was extended to Chiryū Station.

Machine translation — show Japanese original

三河鉄道が知立駅まで延伸。

1923 2月

Karinishi Station was relocated.

Machine translation — show Japanese original

刈谷新駅を移設。

1926 2月5日

The Mikawa Railway was electrified and the Kariya Substation was established.

Machine translation — show Japanese original

三河鉄道が電化、刈谷変電所を設置。

1927 11月10日

Kariyashin Station was relocated and merged with Kariya Station, becoming a shared station with the Ministry of Railways line, and a south entrance was opened.

Machine translation — show Japanese original

刈谷新駅を刈谷駅に移転統合。省線との共同使用駅となり南口を開設。

1941 6月1日

The Mikawa Railway merged with Nagoya Railway to become the Meitetsu Mikawa Line.

Machine translation — show Japanese original

三河鉄道が名古屋鉄道に合併し名鉄三河線となる。

1943 12月

The Meitetsu Mikawa Line set up the Kariya Operations District.

Machine translation — show Japanese original

名鉄三河線に刈谷乗務区を設置。

1948

The Meitetsu Kariya Factory was established as a freight car specialist factory and took over the freight car operations from the Shinagawa Factory.

Machine translation — show Japanese original

貨車専門工場として名鉄刈谷工場が発足。新川工場の貨車業務を刈谷工場へ移管。

1950 9月17日

Direct trains to Nagoya started operating on the Mikawa Line.

Machine translation — show Japanese original

三河線に名古屋方面直通列車が運転開始。

1950 10月1日

The Tōkaidō Main Line began to have limited express trains "Yamato" and "Unzen" make stops.

Machine translation — show Japanese original

東海道本線に急行「大和」「雲仙」が停車するようになる。

1951 11月7日

The Kariya Station area redevelopment project was approved.

Machine translation — show Japanese original

刈谷駅前区画整理が認可される。

1951 12月

The Kariya Station area redevelopment project commenced.

Machine translation — show Japanese original

刈谷駅前区画整理着工。

1952 10月10日

A groundbreaking ceremony for the reconstruction of Kariya Station was held.

Machine translation — show Japanese original

刈谷駅改築工事の地鎮祭が開催される。

1952 11月

Construction began on the renovation of Kariya Station.

Machine translation — show Japanese original

刈谷駅改築工事着工。[[ファイル:Kariya Station-NorthPlaza 1954.jpg|thumb|新駅舎と整備中の北口]]

1953 3月8日

A provisional completion ceremony for the reconstruction of Kariya Station was held, and ticket gates began operating at the new station building.

Machine translation — show Japanese original

刈谷駅改築工事の仮落成式を実施。新駅舎で出改札開始。

1953 3月15日

The limited express "Genkai" began making stops on the Tokaido Main Line.

Machine translation — show Japanese original

東海道本線に急行「げんかい」が停車するようになる。

1953 4月1日

The Japanese National Railways bus service between Kariya Station south exit and Anjo Station opened.

Machine translation — show Japanese original

刈谷駅南口 - 安城駅間の国鉄バスが開通。

1953 5月5日

The completion ceremony for the rebuilding work of Kariya Station was held.

Machine translation — show Japanese original

刈谷駅改築工事の完工式が行われる。

1953 7月3日

The electrification work on the Tokaido Main Line was completed, and trial operation trains were operated on the Kariya Station - Hamamatsu Station section.

Machine translation — show Japanese original

東海道本線電化工事が終わり、刈谷駅 - 浜松駅間で試運転列車が運転される。

1953 7月21日

The Tōkaidō Main Line was electrified and commenced commercial operations.

Machine translation — show Japanese original

東海道本線が電化され、営業運転を開始。

1954 8月

The Sakura-machi Overpass Road Construction Opposition Alliance was formed.

Machine translation — show Japanese original

桜町立体交差道路建設反対期成同盟会が結成される。

1955 2月

Kariya City established the Grade Separation Special Committee.

Machine translation — show Japanese original

刈谷市が立体交差特別委員会を設置する。

1956 4月25日

The urban redevelopment project in front of Kariya Station was completed.

Machine translation — show Japanese original

刈谷駅前区画整理完工。

1956 6月25日

Miyagi Michio died after falling at Kasugai Station.

Machine translation — show Japanese original

宮城道雄が刈谷駅付近で転落死する。

1957 3月

Groundbreaking occurred for the improvement work within Kariya Station.

Machine translation — show Japanese original

刈谷駅構内改良工事着工。

1957 10月1日

The improvement work on the Kariya Station premises was completed.

Machine translation — show Japanese original

刈谷駅構内改良工事完工。

1958 6月

The expansion construction of the pedestrian overpass for Japanese National Railways and Meitetsu Kariya Station connection began.

Machine translation — show Japanese original

国鉄・名鉄刈谷駅連絡用陸橋拡幅工事着工。

1958 9月

The expansion work on the pedestrian overpass for Japanese National Railways and Meitetsu Kariya Station connection was completed.

Machine translation — show Japanese original

国鉄・名鉄刈谷駅連絡用陸橋拡幅工事完工。

1959 4月1日

The Meitetsu Kariya Operations District was relocated to the Chiryu Operations District.

Machine translation — show Japanese original

名鉄刈谷乗務区を知立乗務区に移転。

1959 10月22日

The Kariya Overpass was completed.

Machine translation — show Japanese original

刈谷跨線橋が完成する。

1964

The Kariya factory was reorganized into the Kariya branch factory and became a branch factory of the Narumi factory.

Machine translation — show Japanese original

(日付不詳):刈谷工場が刈谷分工場に改組され、鳴海工場の分工場となる。

1964 9月14日

The "Rapid Express" service began operating between Shin-Odaka and Nishi-Kuwana was not mentioned but rather between Shin-Ono and Nishi-Kuwana was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Nishi-Kuwana was not mentioned but rather between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned but rather between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned but rather between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was not mentioned, instead the "Rapid Express" service began operating between Shin-Ono and Handa was

Machine translation — show Japanese original

新一宮 - 碧南間の「快速特急」が運行開始される(三河線特急を参照)。

1966 3月25日

The Mikawa Line's "rapid express" service began operating as express trains within the line.

Machine translation — show Japanese original

三河線の「快速特急」が線内でも特急運転を開始。

1968 8月26日

Limited express services originating and terminating at Kariya City Station began operation, and the Mikawa Line limited express services became a 4-trains-per-hour system.

Machine translation — show Japanese original

刈谷市駅始発着特急が運行を開始し、三河線特急が毎時4本体制になる。

1968 10月

The Kariya Branch Factory was abolished.

Machine translation — show Japanese original

刈谷分工場が廃止される。

1970 5月6日

The Meitetsu Mikawa Line Kariya City Elevated Promotion Council was formed.

Machine translation — show Japanese original

名鉄三河線刈谷市街地高架促進協議会が結成される。

1971 6月14日

A clock tower was installed at the south exit of Kariya Station and an unveiling ceremony was held.

Machine translation — show Japanese original

刈谷駅南口に時計塔が設置され、除幕式が行われる。

1972 11月1日

The Travel Center opened.

Machine translation — show Japanese original

旅行センター開業。

1974 9月17日

Most of the limited express services on the Mikawa Line were downgraded to rapid services.

Machine translation — show Japanese original

三河線特急のほとんどが急行に格下げされる。

1976 1月21日

The elevated structure for the Kariya - Kariya City section was decided by urban planning.

Machine translation — show Japanese original

刈谷 - 刈谷市間の高架化が都市計画決定。

1977 3月20日

The remaining Mikawa Line limited express trains were downgraded to rapid services, resulting in the complete abolition of limited express services.

Machine translation — show Japanese original

残存した三河線特急が急行に格下げされ特急が全廃。

1978 9月10日

Work began on the temporary line construction between Kariya and Kariya City Station.

Machine translation — show Japanese original

刈谷 - 刈谷市駅間の仮線工事着手。

1978 12月

In the latter part of the month, elevated line construction work began on the section between Kariya and Kariya-shi Station.

Machine translation — show Japanese original

下旬:刈谷 - 刈谷市駅間の高架化工事着手。

1980 12月14日

The section between Kariya and Kariyashi Station was elevated and double-tracked.

Machine translation — show Japanese original

刈谷 - 刈谷市駅間が高架複線化される。

1981 9月1日

The operations at the south exit of Kariya Station were changed to be handled by Meitetsu.

Machine translation — show Japanese original

刈谷駅南口の業務を名鉄担当に変更。

1981 11月20日

The Mikawa Line express service was abolished.

Machine translation — show Japanese original

三河線急行が廃止される。

1984 1月1日

The freight operations on the Mikawa Line were abolished.

Machine translation — show Japanese original

三河線の貨物営業が廃止される。

1986 1月20日

The handling of carload freight on the Tōkaidō Main Line was abolished.

Machine translation — show Japanese original

東海道本線の車扱貨物取扱が廃止される。

1986 11月1日

The handling of freight and container cargo on the Tokaido Main Line was abolished, and all cargo handling was completely discontinued, with the former freight facilities being repurposed to open the Kariya Container Center.

Machine translation — show Japanese original

東海道本線の荷物・コンテナ貨物の取り扱いが廃止され、貨物の取り扱いが全廃する。貨物関連施設を流用して刈谷コンテナセンターを開設。

1987 4月1日

With the privatization of Japanese National Railways, the East Japan Railway Company inherited Kariya Station on the Tokaido Main Line, while Japan Freight Railway Company inherited Kariya Container Center.

Machine translation — show Japanese original

国鉄分割民営化により、東海道本線刈谷駅を東海旅客鉄道(JR東海)が継承。刈谷コンテナセンターは日本貨物鉄道(JR貨物)が継承。

1988 9月4日

The 100th anniversary commemoration of Kariya Station's opening was held.

Machine translation — show Japanese original

刈谷駅開業100周年記念行事が開催される。[[ファイル:KariyaStation-SouthGate.jpg|thumb|180px|完成当初の南北連絡通路]]

1989 1月25日

In 1989, the north-south passage was completed.

Machine translation — show Japanese original

(平成元年):南北連絡通路が完成する。

1990 3月21日

The Mikawa Line's Kariya Station was relocated.

Machine translation — show Japanese original

三河線刈谷駅を移設。

1992 6月27日

JR Central introduced automatic ticket gates.

Machine translation — show Japanese original

JR東海に自動改札機を導入。

2005 9月14日

The transportation prepaid card "Tranpass" became available for use on Meitetsu, and the Kariya Container Center was relocated and renamed Kariya Offrail Station.

Machine translation — show Japanese original

名鉄で交通プリペイドカード「トランパス」の利用が可能となる。刈谷コンテナセンターが移転して刈谷オフレールステーションに改称。

2006 11月25日

The use of the IC card "TOICA" becomes available on JR Central.

Machine translation — show Japanese original

JR東海でICカード「TOICA」の利用が可能となる。

2008 2月

Meitetsu completed its barrier-free construction work, which included the installation of elevators, the addition of stairs, and the extension of platforms.

Machine translation — show Japanese original

名鉄のバリアフリー化工事竣工。エレベータ設置、階段増設、ホーム延長など実施。

2008 12月1日

The pedestrian deck "Minakuru Kariya Wing Deck" at the south exit of the station was completed.

Machine translation — show Japanese original

駅南口のペデストリアンデッキ「みなくる刈谷ウイングデッキ」が完成する。

2009 12月21日

The construction of new stairs within the Tōkaidō Main Line premises was completed.

Machine translation — show Japanese original

東海道本線構内の階段新設工事完工。

2011 2月11日

The use of the IC card "manaca" becomes available on Meitetsu.

Machine translation — show Japanese original

名鉄でICカード「manaca」の利用が可能となる。

2012 2月29日

The use of the Prepaid IC card Transit Pass, or Trampa, came to an end.

Machine translation — show Japanese original

トランパスの使用が終了する。

2023 5月

From the 3rd to the 7th, temporary timetables were in operation due to track switching work accompanying the expansion of the Tokaido Line's down platform.

Machine translation — show Japanese original

3日~7日:東海道線下りホーム拡幅に伴う線路切替工事に伴い臨時ダイヤで運転。

2026 7月23日

A platform gate is to be installed on the JR Central 4th platform.

Machine translation — show Japanese original

JR東海の4番線ホームで、可動柵を設置(予定)。

2027

The JR Central 3rd platform will be equipped with platform screen doors.

Machine translation — show Japanese original

度:JR東海の3番線ホームで、可動柵を設置(予定)。

2029

Plans call for the installation of platform gates on the JR Central's up platform (tracks 1 and 2).

Machine translation — show Japanese original

度:JR東海の上りホーム(1・2番線)で、可動柵を設置(予定)。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kariya Station FAQ

What train lines connect at Kariya Station?

Kariya Station is served by .