Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
13 Events
1921
7月17日
It opened as Tsudanuma Station on the Keisei Electric Railway.
Machine translation — show Japanese original
京成電気軌道の津田沼駅として開業。
1926
12月9日
The Tsudanuma - Shisui section opened.
Machine translation — show Japanese original
津田沼 - 酒々井間が開業。
1931
11月18日
It was renamed Keisei Tsudanuma Station.
Machine translation — show Japanese original
京成津田沼駅に改称。
1953
11月1日
A station on the New Keisei Line of New Keisei Electric Railway opened, initially operating from the Keisei platform.
Machine translation — show Japanese original
新京成電鉄新京成線の駅が開業。当初は京成ホームから発着した。
1955
4月21日
With the full opening of the Shin-Keisei Line, through operations to the Keisei Chiba Line began and were abolished on September 1.
Machine translation — show Japanese original
新京成線の全線開業に伴い京成千葉線へ直通運転を開始、9月1日で廃止した。
1957
10月15日
With the completion of the yard improvement work, which increased the number of platforms and tracks to 3 and 5, respectively, platform 5 began to be used for New Keisei departures and arrivals.
Machine translation — show Japanese original
構内改良工事(3面5線化)完成により新京成発着用として5番線を使用開始。
1968
The platforms for the main line and Chiba line were rebuilt with direction-based separation, a new 6th platform for the Shin-Keisei line was added, and the station was expanded to 3 islands with 6 lines.
Machine translation — show Japanese original
本線・千葉線のホームを方向別に改築、新京成線の6番線を新設、3面6線に拡張。
1968
11月
The station building was elevated, and at the same time, a new passing track was established on the Yatsu side.
Machine translation — show Japanese original
橋上駅舎化。同時に谷津方に引き上げ線を新設。
2006
12月10日
The Shin-Keisei Line began a partial through-service with the Keisei Chiba Line.
Machine translation — show Japanese original
新京成線が京成千葉線に片乗り入れを開始。
2010
7月17日
Keisei Electric Railway introduced station numbers at its stations.
Machine translation — show Japanese original
京成電鉄の駅に駅番号を導入。
2014
2月
Shin-Keisei Electric Railway set the station number "SL24" for its station.
Machine translation — show Japanese original
新京成電鉄の駅に駅番号「SL24」を設定。
2016
4月12日
The seismic reinforcement and station building improvement work on the station building was completed.
Machine translation — show Japanese original
駅舎耐震補強及び駅舎改良工事が完了。
2025
4月1日
The station became a sole Keisei Electric Railway station due to Shin-Keisei Electric Railway's merger into Keisei Electric Railway, and Shin-Keisei Electric Railway's station number SL24 was abolished.
Machine translation — show Japanese original
新京成電鉄が京成電鉄への吸収合併に伴い、京成電鉄単独の駅となる。新京成電鉄の駅番号SL24を廃止。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
Step-free access and facilities not documented yet
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (KEISEI MAIN LINE (KS))
1・2
Up
京成船橋 · 日暮里 · 京成上野
3・4
Down
八千代台 · 京成成田 · 成田空港
↕ Platforms 1, 2, 3, 4 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Keisei-Tsudanuma Station FAQ
What train lines connect at Keisei-Tsudanuma Station?
Keisei-Tsudanuma Station is served by Keisei Chiba Line, Keisei Main Line (KS), Shin-Keisei Line (SL).