国立

Kunitachi Station

Live Network Status Active

Kunitachi is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
37 Events
1926

Hakone Tochi created the station to attract a university (Tokyo University of Commerce, now Hitotsubashi University) and residents, and then transferred it to the Ministry of Railways.

Machine translation — show Japanese original

大学(東京商科大学→一橋大学)や住民の誘致のために箱根土地が駅を作り、鉄道省へ譲渡した。

1926

The station building was designed by Makoto Kanō, who studied under Frank Lloyd Wright during the construction of the new Imperial Hotel building, and the construction work was carried out by Shimizu Corporation.

Machine translation — show Japanese original

駅舎の設計は、帝国ホテル新館建設時にフランク・ロイド・ライトに師事した河野傳が行い、清水建設が工事を担当した。

1926 3月1日

The Ministry of Railways line's Tanbo Signal Station was established.

Machine translation — show Japanese original

鉄道省の谷保信号所として開設。

1926 4月1日

The station was elevated to Kunitachi Station and began handling passengers and freight.

Machine translation — show Japanese original

国立駅に昇格。旅客・貨物取扱開始。

1928 10月15日

The Chuo Line was double-tracked as far as this station.

Machine translation — show Japanese original

中央線が当駅まで複線化。

1929 3月1日

The Chuo Line was doubled-tracked as far as Tachikawa.

Machine translation — show Japanese original

中央線、立川まで複線化。

1929 3月5日

The Chuo Line was electrified and opened for service up to this station, with electric train operations commencing on the Ministry of Railways line, and extending to Tachikawa on June 16.

Machine translation — show Japanese original

中央線、当駅まで電化開通。電車(省線)運転開始。6月16日に立川まで開通。

1949 6月1日

Japanese National Railways was established.

Machine translation — show Japanese original

日本国有鉄道発足。

1951

The station's location, Yanoka Village, was to become Kokuritsu Town upon town formation, with the station name being changed to match the new town name.

Machine translation — show Japanese original

駅所在地の谷保村が町制施行にあたり、駅名から町名をとって国立町となる。

1959 7月15日

The north exit was opened, constructed at a cost of 8.6 million yen, which was fully borne by the local community through a petition.

Machine translation — show Japanese original

北口開設。請願によるもので、建設費860万円全額を地元が負担して建設された。

1962 10月25日

Freight handling was abolished.

Machine translation — show Japanese original

貨物の取り扱いを廃止。

1964 10月1日

Freight handling was abolished.

Machine translation — show Japanese original

荷物扱い廃止。

1970 3月25日

Japanese National Railways began testing its first automatic ticket gate for regular commuters.

Machine translation — show Japanese original

国鉄では初めてとなる自動定期券改札装置の試用を開始。

1973 4月1日

The Musashino Line freight branch line was opened.

Machine translation — show Japanese original

武蔵野線貨物支線が開業。

1987 4月1日

With the privatization of JNR, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化により、東日本旅客鉄道(JR東日本)の駅となる。

1993 4月23日

Automatic ticket gates were installed and put into service.

Machine translation — show Japanese original

自動改札機を設置し、供用開始。

1998

It was selected for the Kanto's 100 Best Stations, with the selection reason being "a station that matches the cherry blossom trees in front of the station with a station building with a red triangular roof".

Machine translation — show Japanese original

関東の駅百選に選定。選定理由は「赤い三角屋根の駅舎が駅前の桜並木とマッチした駅」。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

2003 6月

Elevated railway construction work began.

Machine translation — show Japanese original

高架化工事開始。

2005 9月

The up platform was switched to a temporary line.

Machine translation — show Japanese original

上りホームを仮線に切り替え。

2006 10月8日

The old triangular-roofed station building was taken out of use and the down platform was switched to a temporary line.

Machine translation — show Japanese original

旧三角屋根駅舎の使用を終了。下りホームを仮線に切り替える。

2006 10月26日

The old triangular-roofed station building was designated as a Minami-Tachikawa City designated tangible cultural property.

Machine translation — show Japanese original

旧三角屋根駅舎が「国立市指定有形文化財」に指定される。

2009 1月11日

The down platform was switched to an elevated platform.

Machine translation — show Japanese original

下りホームを高架に切り替える。

2010 11月7日

The up platform was switched to an elevated platform.

Machine translation — show Japanese original

上りホームを高架に切り替える。

2011 10月8日

Track switching work within the station is carried out from after the last train to before the first train for 10 days.

Machine translation — show Japanese original

終電後から10日始発前まで構内線路切り替え工事が行われる。

2012 12月16日

The up main line, No. 3 track, was newly established.

Machine translation — show Japanese original

上り本線(3番線)が新設。

2013 1月13日

The north and south ticket gates were closed and consolidated into one location, and the use of the old north exit station building was terminated.

Machine translation — show Japanese original

南北改札口閉鎖し1ヶ所に統合。旧北口駅舎の使用終了。

2014 3月15日

It becomes a stop on the Musashino service.

Machine translation — show Japanese original

むさしの号の停車駅となる。

2014 5月1日

Operations were outsourced.

Machine translation — show Japanese original

業務委託化。

2015 2月1日

Early morning unmanned operation.

Machine translation — show Japanese original

早朝無人化。

2015 4月18日

The commercial facility "nonowa Kokuritsu EAST" opened.

Machine translation — show Japanese original

商業施設「nonowa国立EAST」が開業。

2016 4月24日

The commercial facility "nonowa Kokuritsu WEST" opened, and the nonowa-guchi ticket gate, which only accepts IC transit cards, began operating.

Machine translation — show Japanese original

商業施設「nonowa国立WEST」が開業。nonowa口改札(交通系ICカード専用)の供用を開始。

2020 4月6日

The restoration of the old triangular-roofed station building was completed and it opened as a hub for promoting the town's charm.

Machine translation — show Japanese original

旧三角屋根駅舎復原工事が終了し、「まちの魅力発信拠点」としてオープン。

2020 6月27日

The commercial facility "nonowa Kokuritsu EAST" was renovated.

Machine translation — show Japanese original

商業施設「nonowa国立EAST」がリニューアル。

2024 1月31日

The Midori no Madoguchi service ended operations.

Machine translation — show Japanese original

みどりの窓口の営業を終了。

2024 2月1日

Introduced ticket vending machines with voice guidance.

Machine translation — show Japanese original

話せる指定席券売機を導入。

2024 3月27日

The commercial facility "nonowa Kokuritsu SOUTH" opened at the south entrance.

Machine translation — show Japanese original

南口に商業施設「nonowa国立SOUTH」が開業。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (CHŪŌ LINE (RAPID))
1 Down
立川 · 八王子 · 高尾
2・3 Up
三鷹 · 新宿 · 東京
Platforms 1, 2, 3 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kunitachi Station FAQ

What train lines connect at Kunitachi Station?

Kunitachi Station is served by Chūō Line (Rapid).