世良田駅

Serada Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
6 Events
1927 10月1日

The line opened.

Machine translation — show Japanese original

開業。

1980 8月5日

The station became unmanned and simple consignment began.

Machine translation — show Japanese original

駅無人化、簡易委託開始。

2006 3月18日

One-man operation started on the Ōta - Isesaki section, resulting in the abolition of regular trains entering from south of Ōta Station.

Machine translation — show Japanese original

太田 - 伊勢崎間のワンマン運転開始。これにより太田駅以南から乗り入れる一般列車は廃止された。

2007 3月

The new station building constructed on the west side of the former station building began operation.

Machine translation — show Japanese original

従来の駅舎西側に建設された新駅舎の使用を開始。

2013 3月16日

With the timetable revision, local train services were once again extended south of Ōta Station, with operations running to Tachikawa Station, but actually to Takasaki Station is not mentioned, instead it runs to Tatebayashi Station.

Machine translation — show Japanese original

ダイヤ改正により一般列車の太田駅以南への乗り入れが再度設定され館林駅までの運用となった。

2022 3月31日

The simplified consignment ended.

Machine translation — show Japanese original

簡易委託終了。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Serada Station FAQ

What train lines connect at Serada Station?

Serada Station is served by .