世良田駅
Serada Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
6 Events
1927
10月1日
The line opened.
Machine translation — show Japanese original
開業。
1980
8月5日
The station became unmanned and simple consignment began.
Machine translation — show Japanese original
駅無人化、簡易委託開始。
2006
3月18日
One-man operation started on the Ōta - Isesaki section, resulting in the abolition of regular trains entering from south of Ōta Station.
Machine translation — show Japanese original
太田 - 伊勢崎間のワンマン運転開始。これにより太田駅以南から乗り入れる一般列車は廃止された。
2007
3月
The new station building constructed on the west side of the former station building began operation.
Machine translation — show Japanese original
従来の駅舎西側に建設された新駅舎の使用を開始。
2013
3月16日
With the timetable revision, local train services were once again extended south of Ōta Station, with operations running to Tachikawa Station, but actually to Takasaki Station is not mentioned, instead it runs to Tatebayashi Station.
Machine translation — show Japanese original
ダイヤ改正により一般列車の太田駅以南への乗り入れが再度設定され館林駅までの運用となった。
2022
3月31日
The simplified consignment ended.
Machine translation — show Japanese original
簡易委託終了。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Serada Station FAQ
What train lines connect at Serada Station?
Serada Station is served by .