TI

TI Tobu Isesaki Line

日本語で読む

Exploring the TI Tobu Isesaki Line network.

The Tobu Isesaki Line (伊勢崎線) is a railway line of Tobu Railway (東武鉄道). It runs from Asakusa Station in Taito, Tokyo, through Tobu-Dobutsu-Koen Station in Miyashiro town, Saitama, to Isesaki Station in Isesaki, Gunma.

History

The line began on 27 August 1899, when the section from Kitasenju to Kuki opened. The first trains carried passengers and freight together. The company was in financial trouble and paid no dividends. After Nezu Kaichiro became president in 1905, a bridge was built over the Tone River. The line reached Ashikaga-machi (now Ashikaga-shi) on 27 August 1907. In 1902 the line was extended to Azumabashi (now Tokyo Skytree station). In 1904 a Kameido line let trains reach Ryogoku station on the Sobu Railway (総武鉄道). The full line to Isesaki opened on 13 July 1910.

In 1907 the government took over the Sobu Railway, so Tobu needed its own terminal in central Tokyo. Tobu reopened the Azumabashi to Kuki section as a freight line in March 1908. It reopened to passengers on 27 March 1910. Azumabashi station was renamed Asakusa on 1 March 1910. In the Taisho period the line was doubled and electrified in stages. The Kanegafuchi to Asakusa section was doubled in 1912, and the whole Tokyo section in 1920. The Asakusa to Nishi-Arai section was electrified in 1924, and Tobu's first electric car, the DEHA 1 type, was built for it. The Arakawa floodway works changed the route between Kanegafuchi and Nishi-Arai in 1923. Electrification reached Kasukabe to Kuki in December 1926. The whole line was electric by 1 October 1927.

From the Showa period, Tobu competed with Keisei Electric Railway (京成電気軌道) to enter Asakusa, a commercial district of Tokyo. Keisei effectively gave up, and on 25 May 1931 Tobu's line reached Asakusa Raikomon station. The station was renamed Asakusa on 1 October 1945. Several stations closed in 1943 and 1945.

After the postwar rebuilding, city functions gathered at the Yamanote Line (山手線) terminal stations. Tobu's line did not connect with the Yamanote Line, so its development fell behind. Around 1955 Tobu asked the Ministry of Transport several times for an underground line from Kitasenju toward Shimbashi or Tokyo Yaesu, but every request was refused. Instead, through running with the Eidan Hibiya Line (営団日比谷線, now Tokyo Metro Hibiya Line) began on 31 May 1962. The through service was extended to Higashi-Ginza in 1963, to Nakameguro in 1964, and to Kita-Kasukabe in 1966. Housing estates such as Soka-Matsubara opened soon after.

Rush-hour crowding grew as housing development continued. Eight-car trains began running on the surface tracks on 18 December 1972. Asakusa station's limits ruled out longer trains, so Tobu built a quadruple track between Kitasenju and Takenotsuka. It opened on 2 July 1974 and was the first quadruple track of a private railway in the Kanto region. On 16 March 1981 Sugito station was renamed Tobu-Dobutsu-Koen station, and the Hibiya Line through trains were extended to it. On 26 August 1986 ten-car trains began running in the morning rush hour between Kuki and Tobu-Dobutsu-Koen.

In 1988 and 1990 Tobu introduced detour tickets (う回乗車), so passengers could avoid changing at Kitasenju. One detour ran via Asakusa and the other via Oshiage. The detour schemes ended on 31 March 1997. In 1997 the quadruple track between Soka and Koshigaya was completed, on 25 March, and Kitasenju station was rebuilt on several levels. In 2001 the quadruple track was extended to Kita-Koshigaya, a total of 18.9 km, which made it the longest quadruple track of any private railway. On 19 March 2003 Oshiage station opened, and trains began running through to the Tokyo Metro Hanzomon Line (東京メトロ半蔵門線) and the Tokyu Den-en-toshi Line (東急田園都市線).

On 11 March 2011 the Great East Japan Earthquake stopped all trains on the line, including through services. Services resumed in stages, and through running with the Hanzomon and Tokyu lines restarted on 2 April 2011. On 17 March 2012 Gyohanbashi station was renamed Tokyo Skytree station, and station numbering was introduced on all lines. In 2020 the TH Liner (THライナー) began on 6 June as the first limited-express-type train on Hibiya Line through services. All ordinary trains became 20 m four-door cars, and platform doors were installed, starting at Kita-Koshigaya. In January 2021 some last trains were cancelled during the new coronavirus state of emergency. Platform doors were completed between Kitasenju and Kita-Koshigaya in 2025. Level crossings in the Tokyo section were removed in 2022 and 2025. On 14 March 2026 one-man operation began on ordinary trains between Kitasenju and Kita-Koshigaya.

See the live map and facts in the Data view →

Written by an AI from the line's history on Japanese Wikipedia, nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Stations
26
Opened
Unknown
Daily Riders
No Data
Operator
Tobu Railway

Route Map

TS30 東武動物公園
TN TS
Tobu-dobutsu-koen
東武動物公園
TI01 和戸
Wado
和戸
TI02 久喜
JU
Kuki
久喜
TI03 鷲宮
Washinomiya
鷲宮
TI04 花崎
Hanasaki
花崎
TI05 加須
Kazo
加須
TI06 南羽生
Minami-hanyu
南羽生
TI07 羽生
Hanyu
羽生
TI08 川俣
Kawamata
川俣
TI09 茂林寺前
Morinjimae
茂林寺前
TI10 館林
Tatebayashi
館林
TI11 多々良
Tatara
多々良
TI12 県
Agata
県
TI13 福居
北陸
Fukui
福居
TI14 東武和泉
Tobu-izumi
東武和泉
TI15 足利市
Ashikagashi
足利市
TI16 野州山辺
Yashu-yamabe
野州山辺
TI17 韮川
Niragawa
韮川
TI18 太田
Ota
太田
TI19 細谷
Hosoya
細谷
TI20 木崎
Kizaki
木崎
TI21 世良田
Serada
世良田
TI22 境町
Sakaimachi
境町
TI23 剛志
Goshi
剛志
TI24 新伊勢崎
Shin-isesaki
新伊勢崎
TI25 伊勢崎
Isesaki
伊勢崎

Community Photos

Photos shared by riders. Spotted this train? Add yours.

Loading photos…

Live map

Loading trains…

Every TI Tobu Isesaki Line train running right now, on the real track. Tap a train to follow it.

Aerial photos, map and Japanese font: 国土地理院. Track: 「国土数値情報(鉄道データ)」(国土交通省), processed by Japanese Transit Wiki. 3D buildings: 「3D都市モデル(Project PLATEAU)」(国土交通省)を加工して作成, where PLATEAU covers the area; Realistic mode streams PLATEAU's textured models for Tokyo's 23 wards directly from MLIT. Train positions: 東武鉄道・公共交通オープンデータ協議会, provided for 公共交通オープンデータチャレンジ2026 — positions update about every 20 seconds and are shown approximately between updates.
Inspired by Mini Tokyo 3D by Akihiko Kusanagi.

TI Tobu Isesaki Line FAQ

What is the TI Tobu Isesaki Line?

The TI Tobu Isesaki Line is a key transit corridor in Tokyo, operated by the regional operator.

How many stations are on the TI Tobu Isesaki Line?

There are 26 stations mapped on this line.