Riding today
Live departures from this stationAbout this station
History, melodies, surroundingsThe station opened as a Nippon Railway station with the simultaneous opening of the Shinmachi - Takasaki section.
Machine translation — show Japanese original
日本鉄道の駅として、新町 - 高崎間開通と同時に開業。
The Nippon Railway line was extended to and opened as far as Maebashi Station.
Machine translation — show Japanese original
日本鉄道線が前橋駅間まで開通。
The government railway, now the Shin'etsu Main Line, was extended to Yokogawa Station.
Machine translation — show Japanese original
官設鉄道(現在の信越本線)が横川駅まで開通。
The Ueno Railway Line, now the Jōshin Electric Railway Jōshin Line, was extended to Fukushima Station, now Kōshū Fukushi Station.
Machine translation — show Japanese original
上野鉄道線(現在の上信電鉄上信線)が福島駅(現在の上州福島駅)まで開通。
The station building was rebuilt into its second generation.
Machine translation — show Japanese original
二代目駅舎に改築。
Nippon Railway was nationalized.
Machine translation — show Japanese original
日本鉄道が国有化。
The third-generation station building was completed.
Machine translation — show Japanese original
三代目駅舎改築竣工。
It is designated as a lost and found station.
Machine translation — show Japanese original
遺失物取卸駅に指定される。
The 3rd platform (now platforms 5 and 6) was added.
Machine translation — show Japanese original
第3ホーム(現5・6番線)を増設。
A special large-scale military exercise was held within Gunma Prefecture, and the Imperial train carrying the Showa Emperor arrived and departed between this month and the 17th.
Machine translation — show Japanese original
群馬県内で陸軍特別大演習。昭和天皇の乗車のお召し列車が同月17日にかけて発着。
The north overpass bridge was expanded.
Machine translation — show Japanese original
北跨線橋増築。
The Emperor Showa's visit to Gunma Prefecture, during which an imperial train ran between Harajuku Station and Takasaki Station.
Machine translation — show Japanese original
昭和天皇の群馬県行幸(昭和天皇の戦後巡幸)。原宿駅 - 高崎駅間でお召し列車が運行。
The east exit began operating.
Machine translation — show Japanese original
東口営業開始。
The Midori-no-Madoguchi ticket office was established.
Machine translation — show Japanese original
みどりの窓口を設置。
The 3rd platform was extended 30 meters towards the Ueno direction.
Machine translation — show Japanese original
第3ホームを上野方面に30メートル延伸。
The Nakairi crossing in Asahi Town became an underground crossing and a cargo container base was completed at the east exit's 6th platform.
Machine translation — show Japanese original
旭町の中居里踏切が立体地下道になる。東口6番線に貨物コンテナ基地が完成。
Jōshin Electric Railway began using its newly constructed platform.
Machine translation — show Japanese original
上信電鉄新設ホーム使用開始。
The 4th platform, now platforms 7 and 8, was newly established.
Machine translation — show Japanese original
第4ホーム(現7・8番線)を新設。
The Travel Center opened.
Machine translation — show Japanese original
旅行センターオープン。
A new Ekiren rental car service was established.
Machine translation — show Japanese original
駅レンタカー新設。
Coin lockers were installed.
Machine translation — show Japanese original
コインロッカーを設置。
The dedicated line for the Monopoly Bureau within the premises was abolished.
Machine translation — show Japanese original
構内の専売局専用線が廃止される。
The high-speed dedicated line for Takasaki Paper within the premises was abolished.
Machine translation — show Japanese original
構内の高崎製紙専用線が廃止される。
The first platform was paved and the track was laid.
Machine translation — show Japanese original
1番線舗装、軌道を敷設。
The Joetsu Shinkansen construction commenced.
Machine translation — show Japanese original
上越新幹線工事着工。
Temporary platform 8 was brought into use.
Machine translation — show Japanese original
仮8番線使用を開始。
Construction began on the new Central Overpass.
Machine translation — show Japanese original
中央跨線橋の新設工事着工。
The improvement construction of the west entrance station square commenced.
Machine translation — show Japanese original
西口駅前広場の改良工事着工。
Construction of the provisional station building commenced.
Machine translation — show Japanese original
仮駅舎建設工事着工。
The construction of the station building commenced.
Machine translation — show Japanese original
駅ビル新築工事着工。
Operations were relocated to the temporary station house.
Machine translation — show Japanese original
業務を仮駅本屋へ移転。
The old station building (third-generation station) was demolished.
Machine translation — show Japanese original
旧本屋(三代目駅舎)を解体。
The 8th track began operation and the 9th track was newly established.
Machine translation — show Japanese original
8番線使用開始および9番線の新設。
The Chuo Overpass began operation.
Machine translation — show Japanese original
中央跨線橋、使用開始。
The dedicated lines for Nisshin and Nippon Seifun within the premises were abolished, and the handling of general cargo was completely discontinued.
Machine translation — show Japanese original
構内の日清・日本製粉の専用線が廃止され、一般貨物の取り扱いが全廃される。
The new station building was completed.
Machine translation — show Japanese original
新駅舎完成。
The station building Takasaki Montreuil opened.
Machine translation — show Japanese original
駅ビル高崎モントレーオープン。
The Jōetsu Shinkansen opened, and the Minami Overpass became a free passage.
Machine translation — show Japanese original
上越新幹線が開業。南跨線橋が自由通路となる。
A unveiling ceremony for the ceramic plate wall painting "Daruma's Poem" was held at the west plaza.
Machine translation — show Japanese original
西口広場で陶板壁画「だるまの詩」の払拭会。
A directly managed café called Voiture, utilizing a passenger car, opened on the south side of the east-west free passage at the west exit.
Machine translation — show Japanese original
西口の東西自由通路南側に客車を利用した高鉄局直営の喫茶店「ヴォワチュール」開店。
With the privatization of Japanese National Railways, the Japanese National Railways stations became stations of JR East and JR Freight.
Machine translation — show Japanese original
国鉄分割民営化により、国鉄の駅はJR東日本とJR貨物の駅となる。
Freight train services were abolished, and thereafter, the only freight trains arriving and departing were for Class-1 freight forwarding to and from Joshin Electric Railway.
Machine translation — show Japanese original
貨物列車の設定が廃止。これ以降の貨物列車の発着は、上信電鉄向けの甲種輸送のみとなっている。
Automatic ticket gates were installed at the conventional line ticket gates and began operation.
Machine translation — show Japanese original
在来線改札口に自動改札機を設置し、供用開始。
The Nagano Shinkansen opened.
Machine translation — show Japanese original
長野新幹線が開業。
Automatic ticket gates were installed at Shinkansen ticket gates and began operation.
Machine translation — show Japanese original
新幹線改札口に自動改札機を設置し、供用開始。
The IC card "Suica" becomes available for use on JR East lines, excluding the Shin'etsu Main Line.
Machine translation — show Japanese original
JR東日本でICカード「Suica」の利用が可能となる(信越本線以外)。
The Shonan-Shinjuku Line began operation.
Machine translation — show Japanese original
湘南新宿ライン運行開始。
The Jōetsu Shinkansen allows the use of Suica FREX commuter passes and Suica FREX Pal commuter passes, but only for trips towards Tokyo.
Machine translation — show Japanese original
上越新幹線でSuica FREX定期券およびSuica FREXパル定期券の利用が可能となる(東京方面のみ)。
Platform 1 ceased handling passengers.
Machine translation — show Japanese original
1番線の客扱い廃止。
In winter, the Station Renaissance at Takasaki Station was completed.
Machine translation — show Japanese original
冬:高崎駅ステーションルネッサンス完成。
In autumn, E'site opened on the east side of Takasaki Station.
Machine translation — show Japanese original
秋:高崎駅東側にE’siteがオープン。
The ticket gates at two locations were consolidated into one, and the number of Midori-no-Madoguchi ticket windows was reduced to one, with the discontinuation of joint transport operations with Ushinotsukei Railway.
Machine translation — show Japanese original
東西2箇所の改札口が1箇所に統合。それに伴いみどりの窓口が1箇所になり、上信電鉄との連絡運輸が廃止。
A new Shinkansen direct ticket gate was installed.
Machine translation — show Japanese original
新幹線直通改札口新設。
The Mobile Suica limited express ticket service began.
Machine translation — show Japanese original
モバイルSuica特急券のサービス開始。
A pedestrian deck connecting the east exit and Takasaki Tower 21 was completed.
Machine translation — show Japanese original
東口と高崎タワー21を結ぶペデストリアンデッキが完成。
IC card "Suica" became available on the Shin'etsu Main Line, and Suica FREX commuter passes and Suica FREX Pal commuter passes became available for use as far as Annaka-Haruna Station on the Hokuriku Shinkansen and Jōmō-Kōgen Station on the Jōetsu Shinkansen.
Machine translation — show Japanese original
信越本線でICカード「Suica」の利用が可能となる。北陸新幹線 安中榛名駅および上越新幹線 上毛高原駅までSuica FREX定期券およびSuica FREXパル定期券の利用が可能となる。
Suica-exclusive ticket gates were installed.
Machine translation — show Japanese original
Suica専用改札設置。
The reconstruction of the east entrance station building and the pedestrian deck in front of the station building were completed, and the expansion of E'site was also completed, with its name changed to E'site Takasaki.
Machine translation — show Japanese original
東口駅舎の改築と駅舎前のペデストリアンデッキの工事が完了。E’siteの拡張も完了し名称を「E’site高崎」に変更。
A new entrance and exit exclusively for the Jōshin Electric Railway was established at the west entrance rotary, and the connecting stairs and escalators from the concourse were abolished.
Machine translation — show Japanese original
上信電鉄専用の出入り口が西口ロータリーに新設された。それに伴い、コンコースからの連絡階段・エスカレーターが廃止された。
The opening of the Hokuriku Shinkansen (Nagano - Kanazawa section) resulted in the former Nagano Shinkansen being renamed the Hokuriku Shinkansen.
Machine translation — show Japanese original
北陸新幹線(長野 - 金沢間)の開業により、それまでの長野新幹線は北陸新幹線と改称される。
The Touch de Go! New Shinkansen service was launched.
Machine translation — show Japanese original
タッチでGo!新幹線のサービスを開始。
The Shinkansen e-ticket service began.
Machine translation — show Japanese original
新幹線eチケットサービス開始。
The booth-type "STATION BOOTH" of the station-in-office "STATION WORK" opened within "E'site Takasaki".
Machine translation — show Japanese original
「E’site高崎」内に駅ナカシェアオフィス「STATION WORK」のブース型「STATION BOOTH」が開業。
The View Plaza ended operations.
Machine translation — show Japanese original
びゅうプラザが営業終了。
An arranged version of Tsutomu Hirasawa's song was introduced as a departure melody on the Shinkansen platform.
Machine translation — show Japanese original
新幹線ホームに布袋寅泰の楽曲をアレンジした発車メロディ(後述)を導入。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
高崎市出身の布袋寅泰の楽曲。
高崎市出身の布袋寅泰の楽曲。
Getting around
Platforms, transfers and navigationTransfers from this platform
Transfers from this platform
Community Photos
Photos shared by riders. Been to this station? Add yours.
Takasaki Station FAQ
What train lines connect at Takasaki Station?
Takasaki Station is served by Ryōmō Line, Takasaki Line, Joetsu Shinkansen.