館林

Tatebayashi Station

Live Network Status Active

Tatebayashi is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
14 Events
1907 8月27日

It opened simultaneously with the opening of the line from Kawamata Station to Ashikaga Town Station.

Machine translation — show Japanese original

川俣駅から足利町駅まで開通と同時に開業。

1937

A wooden station building was completed.

Machine translation — show Japanese original

木造駅舎が竣工。

1969 12月9日

A railway accident occurred at a level crossing on the section between this station and Tataraba Station, which has since been replaced with an overpass.

Machine translation — show Japanese original

当駅 - 多々良駅間の踏切で鉄道事故が発生した(踏切事故・現在は跨道橋が設けられている)

1990 9月25日

Ten-car train operation for up trains from this station to Aoyama-itchome Station began.

Machine translation — show Japanese original

当駅より業平橋駅まで上り列車10両編成運転開始。

1994 8月2日

Eight-car train operation for down trains to this station began.

Machine translation — show Japanese original

当駅までの下り列車8両編成運転開始。

1997 3月25日

Down trains to this station and 10-car train operations on weekends and holidays began.

Machine translation — show Japanese original

当駅までの下り列車および土休日の10両編成運転開始。

1998 10月

It was selected for the 100 Best Stations in the Kanto region.

Machine translation — show Japanese original

関東の駅百選に選定。

2006 3月18日

With the timetable revision, the semi-express was renamed and became a stopping station for the section express, and also became a stopping station for the new section semi-express, and the semi-express running during the day from Asakusa Station was shortened to a local train from Kuki Station.

Machine translation — show Japanese original

ダイヤ改正により準急が名称変更されて区間急行の停車駅となり、新たに区間準急の停車駅となる。日中に運転していた浅草駅発着の準急を久喜駅発着の普通に区間短縮。

2007 8月27日

The 100th anniversary of the opening was commemorated with a photo exhibition.

Machine translation — show Japanese original

開業100周年。写真展開催。

2009 12月4日

The elevated station building and east-west free passage were completed.

Machine translation — show Japanese original

橋上駅舎・東西自由通路が竣工。

2012 3月17日

Station numbering was introduced on the TI 10.

Machine translation — show Japanese original

TI 10の駅ナンバリングが導入。

2013 3月16日

The timetable revision abolished the operation of 10-car train sets entering the station.

Machine translation — show Japanese original

ダイヤ改正により、当駅に乗り入れる10両編成の運用を廃止。

2013 3月26日

Platform lines 2, 3, and 5 introduced departure melodies.

Machine translation — show Japanese original

2番線・3番線・5番線に発車メロディを導入。

2017 4月21日

The limited express Liberty Ryomo began operation and made a stop at the station.

Machine translation — show Japanese original

特急「リバティりょうもう」が運用開始され、新たな停車駅となった。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TI TOBU ISESAKI LINE)
2 Up
久喜 · 東武動物公園 · 東武スカイツリーライン 北千住
3 Down
足利市 · 太田 · 桐生線 赤城
5 Down
足利市 · 太田
Platforms 2, 3, 5 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Tatebayashi Station FAQ

What train lines connect at Tatebayashi Station?

Tatebayashi Station is served by TI Tobu Isesaki Line.