Umegaoka Station (梅ヶ丘駅) is an elevated station in Setagaya, Tokyo, on the Odakyu Odawara Line, run by Odakyu Electric Railway. It opened on 1 April 1934.

History

The station opened on 1 April 1934 under Odakyu Electric Railway. Its platforms became side platforms in 1962.

Work to elevate the line and add extra tracks began on 12 June 1994. The design of the station building was chosen on 16 April 1998. The down line was elevated on 10 March 2002. The up line was elevated on 15 December 2002, on a temporary platform.

The up platform moved to a permanent platform on 20 June 2003. The up express track came into use on 3 October 2004, and the down express track on 21 November 2004. Section express service started on 11 December 2004.

The station was built as a future connection to the Tokyo Yamanote Express Railway, a railway that was never completed, so it has an island platform. Station numbering was introduced in January 2014. Section express service ended on 26 March 2016. From 17 March 2018 the platform was lengthened to take longer trains, and Chiyoda Line trains began stopping at every station. Platform doors came into use on 15 December 2019.

See all 15 dated events in the Data view →

Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
15 Events
1934 4月1日

Opened.

Machine translation — show Japanese original

開設。

1962

Relative-style platformization was implemented.

Machine translation — show Japanese original

相対式ホーム化。

1994 6月12日

Construction began on the elevated and quadruple-tracking project.

Machine translation — show Japanese original

高架化・複々線化工事着工。

1998 4月16日

The exterior design of the station building was determined as part of the elevated quadruple-tracking project.

Machine translation — show Japanese original

高架複々線化事業に伴う駅舎外観デザイン決定。

2002 3月10日

The down line was elevated.

Machine translation — show Japanese original

下り線高架化。

2002 12月15日

The up line was elevated (with temporary platforms in operation).

Machine translation — show Japanese original

上り線高架化(仮設ホームで営業)。

2003 6月20日

The up-line platform was relocated to the main platform.

Machine translation — show Japanese original

上り線ホームを本設ホームへ移設。

2004 10月3日

The up express line began operation.

Machine translation — show Japanese original

上り急行線使用開始。

2004 11月21日

Downbound express line usage began.

Machine translation — show Japanese original

下り急行線使用開始。

2004 12月11日

The section semi-express service was introduced, and it became a stopping station.

Machine translation — show Japanese original

区間準急新設、停車駅となる。

2009

It was established as a future "transfer station" with the planned Tokyo Yamate Express Electric Railway, and had an island platform with a shared passage for transfers.

Machine translation — show Japanese original

東京山手急行電鉄(未成線)との将来の「接続駅」として設けられた。乗換通路を上下共用とするため、島式ホーム1面という構造であった。

2014 1月

Station numbering was introduced and began to be used at OH 09.

Machine translation — show Japanese original

OH 09の駅ナンバリング導入、使用開始。

2016 3月26日

The sectional semi-express service was abolished, and it once again stopped only at local stations.

Machine translation — show Japanese original

区間準急廃止、再度各駅停車のみ停車となる。

2018 3月17日

The effective length of the platform was extended to accommodate 10-car trains, and Tokyo Metro Chiyoda Line through trains, which stop at all stations, began to make stops.

Machine translation — show Japanese original

ホーム有効長が10両対応となり、東京メトロ千代田線直通列車(全区間各停)が停車するようになる。

2019 12月15日

In 2019, the use of platform doors was started.

Machine translation — show Japanese original

(令和元年):ホームドアの使用を開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Nearby landmarks not documented yet
Accessibility
Step-free access and facilities not documented yet

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Umegaoka Station FAQ

What train lines connect at Umegaoka Station?

Umegaoka Station is served by Odakyu Odawara Line (OH).