Setagaya-Daita Station (世田谷代田駅) is an underground station in Setagaya, Tokyo, on the Odakyu Odawara Line, run by Odakyu Electric Railway. It opened on 1 April 1927 as Setagayanakahara Station (世田ヶ谷中原駅).
History
The station opened on 1 April 1927 as Setagayanakahara Station. Air raid damage burned the station building on 1 July 1945, and service was suspended. Service resumed on 15 June 1946. The station was renamed Setagaya-Daita Station on 20 August 1946.
A notice of the start of underground and extra-track work was filed in September 2004. On 26 March 2006 a temporary station building was built over the tracks. The down line moved to a temporary platform on 31 January 2009, and the up line on 25 July 2009. On 23 March 2013 a temporary platform was added on the underground express tracks, making the station underground, and the ticket gate moved to the second underground level.
Station numbering was introduced in January 2014. The south part of the ground station was completed on 29 August 2015, and the ticket gate moved from the second underground level to ground level. The ground station building was completed on 24 March 2017. On 3 March 2018 the temporary underground express platform closed and the permanent underground platform came into use.
Chiyoda Line through trains began stopping here on 17 March 2018. An east ticket gate for IC cards only opened on 6 March 2021.
See all 15 dated events in the Data view →
Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.