Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
14 Events
1929
12月11日
The station was opened when the Nambu Railway line between Funabashi-Hara Station and Tachikawa Station was inaugurated, with the station building located on the current south side.
Machine translation — show Japanese original
南武鉄道分倍河原駅 - 立川駅間開通時に開設。駅舎は現在の南口側にあった。
1944
4月1日
The Nambu Railway was nationalized and the station became part of the Ministry of Railways line Nambu Line under the Ministry of Transport and Communications.
Machine translation — show Japanese original
南武鉄道が国有化、運輸通信省南武線の駅となる。
1958
4月10日
Freight handling was abolished.
Machine translation — show Japanese original
荷物扱い廃止。
1959
7月10日
Freight handling was abolished.
Machine translation — show Japanese original
貨物取扱廃止。
1966
3月25日
The section between this station and Nishikokuritsu was double-tracked.
Machine translation — show Japanese original
当駅 - 西国立間複線化。
1966
9月30日
The section between Inagi-Naganuma and this station was double-tracked, completing the double-tracking of the entire Nambu Line from Kawasaki to Tachikawa.
Machine translation — show Japanese original
稲城長沼 - 当駅間複線化。南武線(川崎 - 立川)全線の複線化が完成。
1979
The station was elevated.
Machine translation — show Japanese original
橋上駅舎化。
1987
4月1日
With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).
Machine translation — show Japanese original
国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。
1993
10月15日
Automatic ticket gates were installed and put into service.
Machine translation — show Japanese original
自動改札機を設置し、供用開始。
2001
11月18日
The IC card "Suica" becomes available for use.
Machine translation — show Japanese original
ICカード「Suica」の利用が可能となる。
2010
2月28日
The Midori no Madoguchi service ended operations.
Machine translation — show Japanese original
みどりの窓口の営業終了。
2015
3月14日
The station becomes a rapid service bypass stop with the start of rapid service operations on the entire Nanbu Line.
Machine translation — show Japanese original
南武線全区間での快速運転開始に伴い、快速通過駅となる。
2015
3月22日
The elevator inside the ticket gates began operation.
Machine translation — show Japanese original
改札内のエレベーターが使用開始。
2023
2月28日
The use of Smart Home Doors began.
Machine translation — show Japanese original
スマートホームドアの使用開始。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (NAMBU LINE)
1
Down
西国立 · 立川
2
Up
府中本町 · 登戸 · 川崎
↕ Platforms 1, 2 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Yaho Station FAQ
What train lines connect at Yaho Station?
Yaho Station is served by Nambu Line.