和泉多摩川
Izumi-Tamagawa Station
Live Network Status Active
Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
18 Events
1927
4月1日
Opened.
Machine translation — show Japanese original
開設。
1937
9月1日
It becomes a stopping station for the "Direct" train bound for Katase-Enoshima Station (the "Direct" train bound for Odawara passes through).
Machine translation — show Japanese original
片瀬江ノ島駅行「直通」の停車駅となる(小田原方面行「直通」は通過)。
1948
9月
The Sakura semi-express was established and it became a stop.
Machine translation — show Japanese original
桜準急新設、停車駅となる。
1951
4月
It becomes a stop for semi-express trains.
Machine translation — show Japanese original
準急の停車駅となる。
1964
11月5日
It becomes a passing station for semi-express trains.
Machine translation — show Japanese original
準急の通過駅となる。
1989
7月
In 1989, construction began on the quadruple-tracking project between Kitami Station and the current station.
Machine translation — show Japanese original
(平成元年):喜多見駅 - 当駅間複々線化工事着工。
1995
3月26日
The line was elevated, with the up line operating from a temporary platform.
Machine translation — show Japanese original
高架化(上り線は仮設ホームで営業)。
1996
12月1日
The up-line platform was relocated to the main platform.
Machine translation — show Japanese original
上り線ホームを本設ホームへ移設。
1997
4月27日
The current station building began to be used.
Machine translation — show Japanese original
現駅舎使用開始。
1997
6月23日
Quadruple-tracking began.
Machine translation — show Japanese original
複々線使用開始。
1999
4月
The station front rotary was completed and route buses began entering.
Machine translation — show Japanese original
駅前ロータリー完成、路線バス乗入開始。
2003
4月
The ticket gates on the Komae Station side began to be used.
Machine translation — show Japanese original
狛江駅側の改札口使用開始。
2004
12月11日
The section semi-express service was introduced, and it became a stopping station.
Machine translation — show Japanese original
区間準急新設、停車駅となる。
2014
1月
Station numbering was introduced and began to be used at OH 17.
Machine translation — show Japanese original
OH 17の駅ナンバリング導入、使用開始。
2016
3月26日
The sectional semi-express service was abolished, and it once again stopped only at local stations.
Machine translation — show Japanese original
区間準急廃止、再度各駅停車のみ停車となる。
2018
3月17日
Service began with through trains on the Tokyo Metro Chiyoda Line.
Machine translation — show Japanese original
東京メトロ千代田線直通列車停車開始。
2025
3月15日
It became a stop for semi-express trains, all of which continued on to the Chiyoda Line.
Machine translation — show Japanese original
準急(全列車千代田線直通)の停車駅となる。
2026
Within the fiscal year: the use of platform doors is scheduled to begin.
Machine translation — show Japanese original
年度内:ホームドアの使用を開始(予定)。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Izumi-Tamagawa Station FAQ
What train lines connect at Izumi-Tamagawa Station?
Izumi-Tamagawa Station is served by Odakyu Odawara Line (OH).