Kakegawa

Kakegawa Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
21 Events
1889 4月16日

The government railway section between Shizuoka Station and Hamamatsu Station opened, commencing operations.

Machine translation — show Japanese original

官設鉄道静岡駅 - 浜松駅間が開通し、開業。

1895 4月1日

The line name was established and it became part of the Tōkaidō Line, which was later renamed the Tōkaidō Main Line in 1909.

Machine translation — show Japanese original

線路名称制定。東海道線(1909年に東海道本線に改称)の所属となる。

1930 5月30日

The Shōwa Emperor made an imperial visit within Shizuoka Prefecture, with an imperial train operating from Shimada Station to Kakegawa Station.

Machine translation — show Japanese original

昭和天皇が静岡県内を行幸。島田駅発-掛川駅着のお召し列車が運転。

1935 4月17日

The Futamata Line was extended to Toi Station, which became a transfer station.

Machine translation — show Japanese original

二俣線が遠江森駅まで開通し接続駅となる。

1940 6月

The station was rebuilt with a wooden station building, the second version.

Machine translation — show Japanese original

木造の現駅舎に改築(2代目)。

1984 1月21日

Freight handling was abolished.

Machine translation — show Japanese original

貨物の取扱を廃止。

1985 3月14日

Freight handling was abolished.

Machine translation — show Japanese original

荷物の取扱を廃止。

1987 2月15日

The Midori-no-Madoguchi ticket office was opened.

Machine translation — show Japanese original

みどりの窓口開設。

1987 3月15日

The Futamata Line was third-sectorized and transferred to the Tenryū Hamanako Railroad.

Machine translation — show Japanese original

二俣線が第三セクター化、天竜浜名湖鉄道に転換。

1987 4月1日

The privatization of Japanese National Railways resulted in the stations on the Tokaido Main Line being inherited by JR Central.

Machine translation — show Japanese original

国鉄分割民営化により、東海道本線の駅はJR東海に承継される。

1988 3月13日

A station on the Tokaido Shinkansen opened as a requested station, with construction costs borne by the local community.

Machine translation — show Japanese original

東海道新幹線の駅が開業。請願駅であり建設費は地元負担。

1992 11月28日

Automatic ticket gates were introduced at stations on the Tōkaidō Main Line.

Machine translation — show Japanese original

東海道本線の駅に自動改札機を導入。

1998 3月17日

Automatic ticket gates were introduced at Shinkansen stations.

Machine translation — show Japanese original

新幹線の駅に自動改札機を導入。

2002 6月11日

A special late-night bullet train, the "Special", departed from this station to transport spectators returning home from the 2002 FIFA World Cup.

Machine translation — show Japanese original

FIFA(国際サッカー連盟)主催2002サッカーワールドカップ の帰宅客輸送のための当駅始発の深夜新幹線「特別号」を運転。

2008 3月1日

The IC card "TOICA" becomes available for use, and it also becomes possible to exit using TOICA at the ticket gates for the Tenhama Line.

Machine translation — show Japanese original

ICカード「TOICA」の利用が可能となる。天浜線用の改札口からもTOICAで退場することが可能になる。

2010 2月1日

The station began using barrier-free facilities such as multi-function toilets, elevators, and escalators, as well as a pedestrian overpass connecting the elevated platforms.

Machine translation — show Japanese original

駅に多機能トイレ・エレベーター・エスカレーターなどのバリアフリーと高架の連絡通路の使用開始。

2012 12月

Construction of a temporary station building began to accompany seismic reinforcement work on the wooden station building at the north exit.

Machine translation — show Japanese original

北口の木造駅舎の耐震化工事に伴い、仮設駅舎の建設を開始する。

2013 3月20日

Temporary station facilities began handling passengers.

Machine translation — show Japanese original

仮設駅舎による客扱いを開始する。

2013 5月13日

Demolition work on the station building began.

Machine translation — show Japanese original

駅舎の解体工事を開始する。

2013 7月

Construction on the new station building began.

Machine translation — show Japanese original

駅舎新築工事を開始する。

2014 1月26日

The station began handling passengers with the new station building.

Machine translation — show Japanese original

新駅舎による客扱いを開始する。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TOKAIDO SHINKANSEN)
4 Up
東京
5 Down
新大阪
Platforms 4, 5 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kakegawa Station FAQ

What train lines connect at Kakegawa Station?

Kakegawa Station is served by Tokaido Shinkansen.